![horiba Fluorolog-3 Operation Manual Download Page 181](http://html1.mh-extra.com/html/horiba/fluorolog-3/fluorolog-3_operation-manual_2162215181.webp)
Fluorolog-3 v. 2.2 (9 Aug 2002)
TRIAX operation with the Fluorolog
®
-3
14-4
Cable between
controller and
CCD chip
Communication between TRIAX and SpectrAcq
A cable runs between the TRIAX and SpectrAcq for proper
communication. To the right is a photograph of the cable
attachment to the TRIAX.
Cables to CCD detector
A coaxial cable runs from the terminal on the back of the TRIAX
to the CCD. This controls the CCD shutter. The large 37-pin
cable (bound together with the coaxial cable) carries data between
the CCD controller and the CCD chip inside the detector.
CCD controller
A GPIB cable connects between the
CCD controller and the host
computer.
GPIB cable
from controller
to host PC
Back of CCD con-
troller
Cable from
controller
to CCD
CCD detector
CCD
detec-
tor
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com