Operation
163
4812313240.pdf
2017-12-1
Fig. 1. Shut-off valve
2. Filter housing
3. Hose
1
2
3
Operation
Before starting
Preparing for operation
To protect the water system from corrosion and
frost, it is filled with around 5-7litres of antifreeze in
the factory.
Before first starting up the machine, this must be
drained off, collected and disposed of in an
environmentally sound way under due
consideration of local rulings.
-
Close shut-off valve (1).
-
Unscrew filter housing (2) and drain.
-
Open hoses on pumps (3) and run empty.
Observe safety measures (gloves, protective
goggles etc.)
Devices and aids
To prevent delays and to ensure a problem-free
flow of work, before starting work, operators
should check whether all the devices and aids
required for smooth operation are available.
A sufficient quantity of lubrication agents and fuel
substances, tools, spare milling tools and other
spare parts required as well as items of clothing
for personal safety (protective clothing, reflective
jackets, gloves, ear protection) should be
available.
Summary of Contents for PL2000F
Page 2: ......
Page 15: ...Introduction 4 4812313240 pdf 2017 12 1...
Page 29: ...Safety General instructions 18 4812313240 pdf 2017 12 1...
Page 33: ...Special instructions 22 4812313240 pdf 2017 12 1...
Page 35: ...Technical specifications 24 4812313240 pdf 2017 12 1 Dimensions...
Page 41: ...Technical specifications 30 4812313240 pdf 2017 12 1...
Page 56: ...Machine description 45 4812313240 pdf 2017 12 1 Decals...
Page 57: ...Machine description 46 4812313240 pdf 2017 12 1...
Page 58: ...Machine description 47 4812313240 pdf 2017 12 1...
Page 66: ...Machine description 55 4812313240 pdf 2017 12 1 Switch panel Main console left right...
Page 68: ...Machine description 57 4812313240 pdf 2017 12 1...
Page 70: ...Machine description 59 4812313240 pdf 2017 12 1...
Page 72: ...Machine description 61 4812313240 pdf 2017 12 1...
Page 74: ...Machine description 63 4812313240 pdf 2017 12 1...
Page 76: ...Machine description 65 4812313240 pdf 2017 12 1...
Page 78: ...Machine description 67 4812313240 pdf 2017 12 1...
Page 80: ...Machine description 69 4812313240 pdf 2017 12 1 Control lever panel...
Page 82: ...Machine description 71 4812313240 pdf 2017 12 1 LH RH Ergo control...
Page 92: ...Machine description 81 4812313240 pdf 2017 12 1...
Page 173: ...Machine description 162 4812313240 pdf 2017 12 1...
Page 190: ...Miscellaneous 179 4812313240 pdf 2017 12 1 Fix points Fig Fix points...
Page 207: ...Operating instructions 196 4812313240 pdf 2017 12 1...
Page 209: ...Preventive maintenance 198 4812313240 pdf 2017 12 1...
Page 211: ...Maintenance Lubricants and symbols 200 4812313240 pdf 2017 12 1...