Maintenance
247
4812313240.pdf
2017-12-1
Water system
Water tank
The filling level of the water tank should be tested
before each start. If necessary, the tank must be
refilled.
Check the water level of the water tank several
times a day using water level indicators located on
the sides of the tank.
The water tank should preferably be cleaned
when it is empty.
If the machine is not in continuous operation, the
water should be replaced once per year.
- Fully drain the tank by opening the drain valve
(1) on the underside of the machine.
- To drain out all the residue, open the two outlet
points (2) on the left and right of the machine
underside.
Opening (3) serves as an overflow if the tank is
overfilled.
The cover of water tank can be unscrewed out.
- With the high-pressure cleaner, spray the
inside of the empty tank.
If necessary, a person can climb through the
opened lid into the tank in order to execute
cleaning work.
- The loosened sediments run out through the
opened drainage valve.
- After cleaning, close the drainage valve and
the locking lid of the water tank again.
Fig. 1. Valve
2. Outlet points
3. Port
2
3
Summary of Contents for PL2000F
Page 2: ......
Page 15: ...Introduction 4 4812313240 pdf 2017 12 1...
Page 29: ...Safety General instructions 18 4812313240 pdf 2017 12 1...
Page 33: ...Special instructions 22 4812313240 pdf 2017 12 1...
Page 35: ...Technical specifications 24 4812313240 pdf 2017 12 1 Dimensions...
Page 41: ...Technical specifications 30 4812313240 pdf 2017 12 1...
Page 56: ...Machine description 45 4812313240 pdf 2017 12 1 Decals...
Page 57: ...Machine description 46 4812313240 pdf 2017 12 1...
Page 58: ...Machine description 47 4812313240 pdf 2017 12 1...
Page 66: ...Machine description 55 4812313240 pdf 2017 12 1 Switch panel Main console left right...
Page 68: ...Machine description 57 4812313240 pdf 2017 12 1...
Page 70: ...Machine description 59 4812313240 pdf 2017 12 1...
Page 72: ...Machine description 61 4812313240 pdf 2017 12 1...
Page 74: ...Machine description 63 4812313240 pdf 2017 12 1...
Page 76: ...Machine description 65 4812313240 pdf 2017 12 1...
Page 78: ...Machine description 67 4812313240 pdf 2017 12 1...
Page 80: ...Machine description 69 4812313240 pdf 2017 12 1 Control lever panel...
Page 82: ...Machine description 71 4812313240 pdf 2017 12 1 LH RH Ergo control...
Page 92: ...Machine description 81 4812313240 pdf 2017 12 1...
Page 173: ...Machine description 162 4812313240 pdf 2017 12 1...
Page 190: ...Miscellaneous 179 4812313240 pdf 2017 12 1 Fix points Fig Fix points...
Page 207: ...Operating instructions 196 4812313240 pdf 2017 12 1...
Page 209: ...Preventive maintenance 198 4812313240 pdf 2017 12 1...
Page 211: ...Maintenance Lubricants and symbols 200 4812313240 pdf 2017 12 1...