Required Maintenance For Noise Control Systems
The following maintenance services must be performed
every six months or 7,500 miles (12 000 km) whichever
comes first, to assure proper operation of the noise
control systems. In addition, inspection and service
should be performed anytime a malfunction is observed
or suspected. Proper maintenance of the entire vehicle
will help the effectiveness of the noise control systems.
Exhaust System
Inspect the entire exhaust system for leaks and damaged
parts. Devices such as hangers, clamps, and U-bolts
should be tight and in good condition. Damaged compo-
nents, burned or blown out mufflers, burned or rusted
out exhaust pipes should be replaced according to the
procedures and specifications outlined in the appropriate
service manual.
Air Cleaner Assembly
Inspect air cleaner housing for proper assembly and fit.
Make certain that the air cleaner is properly positioned
and that the cover is tight. Check all hoses leading to the
air cleaner for tightness. The air filter element must also
be clean and serviced according to the instructions out-
lined in the Maintenance Schedule section of this manual.
Tampering With Noise Control System Prohibited
Federal law prohibits the following acts or the causing
thereof: (1) the removal or rendering inoperative by any
person, other than for purposes of maintenance, repair, or
replacement, of any device or element of design incorpo-
rated into any new vehicle for the purpose of noise
control prior to its sale or delivery to the ultimate
purchaser or while it is in use, or (2) the use of the vehicle
after such device or element of design has been removed
or rendered inoperative by any person.
6
MAINTAINING YOUR VEHICLE
323
Summary of Contents for 2014 Ram 1500
Page 1: ...R a m Tr u c k O W N E R S M A N U A L 2 0 1 4 D i e s e l S u p p l e m e n t ...
Page 3: ...RAM DIESEL SUPPLEMENT RAM 1500 3 RAM 2500 3500 4500 5500 137 INDEX 345 ...
Page 4: ......
Page 5: ...RAM 1500 ...
Page 6: ......
Page 8: ......
Page 9: ...INTRODUCTION CONTENTS 䡵 A MESSAGE FROM FCA US LLC 8 1 ...
Page 12: ......
Page 18: ...INSTRUMENT CLUSTER 16 UNDERSTANDING YOUR INSTRUMENT PANEL ...
Page 19: ...INSTRUMENT CLUSTER 3 UNDERSTANDING YOUR INSTRUMENT PANEL 17 ...
Page 128: ......
Page 138: ......
Page 139: ...RAM 2500 3500 4500 5500 ...
Page 140: ......
Page 142: ......
Page 143: ...INTRODUCTION CONTENTS 䡵 A MESSAGE FROM FCA US LLC 142 1 ...
Page 146: ......
Page 154: ...INSTRUMENT CLUSTER 152 UNDERSTANDING YOUR INSTRUMENT PANEL ...
Page 155: ...INSTRUMENT CLUSTER 3 UNDERSTANDING YOUR INSTRUMENT PANEL 153 ...
Page 283: ...WHAT TO DO IN EMERGENCIES CONTENTS 䡵 JUMP STARTING 282 With Portable Starting Unit 285 5 ...
Page 288: ......
Page 334: ......
Page 346: ......
Page 347: ...INDEX ...
Page 360: ...14D241 226 AF Sixth Edition Rev 2 Printed in U S A FCA US LLC ...