
2.4 Grounding, and Connections
15
2 Introduction
2.1 Meaning of the Symbols Used in this Manual
2.2 Proper Operation
The described components may only be installed and operated as described
in this manual. Commissioning, maintenance, inspection and operation are
only to be performed by trained personnel.
2.3 Trained Personnel
Trained personnel in the sense of this manual means persons who are familiar
with the installation, mounting, commissioning, and operation of the
HEIDENHAIN components. Furthermore, electrical engineering work on the
system may be carried out only by trained electrical engineering technicians or
persons trained specifically for the respective application. Basically, persons
who perform work on HEIDENHAIN components must meet the following
requirements:
They must have been trained or instructed in the standards of safety engi-
neering.
They must have appropriate safety equipment (clothing, measuring
systems).
They should be skilled in first-aid practice.
2.4 Grounding, and Connections
See Chapter 4 of the Installation Manual (I.D. 1034382-20) for wiring, and
connection diagrams.
Danger
Failure to comply with this information could result in most serious up to
fatal injuries or in substantial material damage.
Attention
Failure to comply with this information could result in injuries and
interruptions of operation up to material damage.
Note
Insights for operation as well as important information, for example about
standards and regulations as well as for better understanding of the
document.
Summary of Contents for MILLPWR G2
Page 1: ...Technical Manual ACU RITE MILLPWRG2 ...
Page 2: ......
Page 14: ...14 ACU RITE Technical Manual MILLPWRG2 ...
Page 40: ...40 ACU RITE Technical Manual MILLPWRG2 ...
Page 58: ...58 ACU RITE Technical Manual MILLPWRG2 3 10 3 USB Hub ...
Page 60: ...60 ACU RITE Technical Manual MILLPWRG2 TS 220 Adapter cable for TS 120 TS 220 ...
Page 61: ...3 10 Dimensions 61 SE 640 transmitter receiver unit ...
Page 62: ...62 ACU RITE Technical Manual MILLPWRG2 SE 540 transmitter receiver unit ...
Page 63: ...3 10 Dimensions 63 TS 440 TS 640 ...
Page 64: ...64 ACU RITE Technical Manual MILLPWRG2 ...
Page 392: ...392 ACU RITE Technical Manual MILLPWRG2 ...
Page 545: ......