
6-44
TI71M01D06-01EN 3rd Edition: 2012.12.01
Initial Operation Test Procedure
Check that the motor is properly installed and wired.
Turn the power supplies ON to check that an error does not occur.
Turn the servo ON.
Perform auto-tuning to adjust the gains of the position and
velocity control loops.
Perform jog operation.
Perform homing.
Execute positioning operation using the utility software.
Start of initial operation test
(1) Check before operation
(2) Turn the power supplies ON
(3)
Turn the servo ON
(4)
Auto-tuning
(5)
Jog operation
(6)
Homing
(7) Execute positioning operation
End of initial operation test