Technical Data
10-17
7SA6 Manual
C53000-G1176-C156
Measuring tolerances
with sinusoidal quantities
and U
K
/U
N
>
0.1
1
) Secondary values based on I
N
= 1 A; for I
N
= 5 A they must be multiplied with 5.
2
) Secondary values based on I
N
= 1 A;
for I
N
= 5 A the impedances must be devided by 5.
Times
Shortest trip time
approx. 17 ms (50 Hz) / 15 ms (60 Hz)
with fast relays
approx. 12 ms (50 Hz) / 10 ms (60 Hz)
with high–speed relays
Drop-off time
approx. 30 ms
Stage timers
0.00 s to 30.00 s;
∞
(steps 0.01 s)
for all zones;
separate time setting possibilities for
single-phase and multi-phase faults
for the zones Z1, Z2, and Z1B
Time expiry tolerances
1 % of set value or 10 ms
The set times are pure delay times.
Emergency
Operation
In case of measured voltage failure,
See Section 10.10
e.g. voltage secondary mcb trip
∆
X
X
--------
5 %
for 30°
ϕ
sc
90°
≤
≤
≤
∆
R
R
--------
5 %
for 0°
ϕ
sc
60°
≤
≤
≤
∆
Z
Z
-------
5 %
for –30°
ϕ
sc
ϕ
line
–
30°
≤
≤
≤
Содержание siprotec 7SA6
Страница 2: ...Siemens Aktiengesellschaft Book No C53000 G1176 C156 2 ...
Страница 18: ...xviii 7SA6 Manual C53000 G1176 C156 2 ...
Страница 32: ...Introduction 1 14 7SA6 Manual C53000 G1176 C156 2 ...
Страница 82: ...Hardware and Connections 2 50 7SA6 Manual C53000 G1176 C156 2 ...
Страница 119: ...SIPROTEC 4 Devices 4 25 7SA6 Manual C53000 G1176 C156 2 Figure 4 20 CFC Logic example ...
Страница 190: ...Configuration 5 62 7SA6 Manual C53000 G1176 C156 2 ...
Страница 559: ...Control During Operation 7 45 7SA6 Manual C53000 G1176 C156 2 Figure 7 45 Circuit breaker trip test in DIGSI 4 ...
Страница 652: ...Installation and Commissioning 8 78 7SA6 Manual C53000 G1176 C156 2 ...
Страница 724: ...Technical Data 10 56 7SA6 Manual C53000 G1176 C156 ...
Страница 800: ...Appendix A 76 7SA6 Manual C53000 G1176 C156 2 ...
Страница 866: ...Appendix B 66 7SA6 Manual C53000 G1176 C156 2 ...