GREE GMV5 HR HEAT RECOVERY UNITS
126
2 REQUIRED FILES AND TOOLS FOR
ENGINEERING COMMISSIONING
2.1 Required Tools for Engineering Commissioning of GREE
VRF
Inner hexagon spanner
Digital thermometer
Shifting spanner
Noise meter
Cross screwdriver
Clamp meter
Straight screwdriver
Digital multimeter
Vacuum pump
Electricity meter
Electronic balance
Timer
System high and low pressure gauges for corresponding refrigerants
Step ladder
Wind-speed transmitter
…
The GMV5 VRF provides two commissioning methods. One is to perform commissioning by
pressing buttons on the main board of ODU. The other is to perform commissioning on a PC through
professional software. Parameters of the ODU and IDU can be simultaneously displayed with the
second method. (For details about these methods, refer to respective instructions.)
2.2 Commissioning Files
The following commissioning files are required to record installation and commissioning of units:
pre-commissioning scheme determination meeting minutes, commissioning personnel record tables,
commissioning system appearance check record tables, commissioning data record tables, and
commissioning reports. See attached tables for file formats.
3 ENGINEERING COMMISSIONING
PROCEDURES
3.1 Pre-commissioning Preparations
3.1.1 Overall Commissioning Plan
Before commissioning, the person-in-charge should learn about the overall engineering progress
plan, overall workload of engineering commissioning, possible influence factors in achieving the
commissioning progress, and required labors and materials.
3.1.2 Composition of Commissioning Members
Commissioning members comprise aftersales commissioning personnel and installation personnel.
All commissioning participants must take part in professional training courses before unit
commissioning. All participants can be grouped as required and each group should include at least
professional commissioning personnel and assistants.
3.1.3 Preparations of Commissioning Tools and Instruments
(1) Make sure that the following tools or instruments are prepared before commissioning.
Содержание GC201808-III
Страница 36: ...GREE GMV5 HR HEAT RECOVERY UNITS 32 Circuit diagram of GMV Q144WM B1 F U Circuit diagram of GMV Q168WM B1 F U ...
Страница 87: ...GREE GMV5 HR HEAT RECOVERY UNITS 83 1 External Connection for Individual Units ...
Страница 92: ...GREE GMV5 HR HEAT RECOVERY UNITS 88 ...
Страница 227: ...GREE GMV5 HR HEAT RECOVERY UNITS 223 Troubleshooting ...
Страница 286: ...GREE GMV5 HR HEAT RECOVERY UNITS 282 Troubleshooting ...
Страница 314: ...GREE GMV5 HR HEAT RECOVERY UNITS 310 4 Loosen the screws on the compressor drive as shown in the figure below ...
Страница 362: ...JF00302879 ...