GREE GMV5 HR HEAT RECOVERY UNITS
77
d) The connection between the drain pipe and that of the IDU is shown in the following figure.
e) Apply insulation materials to the condensate water pipe joints to prevent dewing. d.
Insulation for connection between the drain pipe and that of the IDU is shown in the
following figure.
(2) Drain Pipe Installation for IDU
a) Use pipe clips instead of applying glue to connect the hoses provided upon delivery and
plastic pipes on the device. Connect the other end of the joint to the elbow. The height from
the suction inlet of the discharge pump is about 200mm (7-7/8in.) to 500 mm(19-11/16in.).
Ensure a proper inclination degree while connecting to the main drain pipe.
b) The lifting pipe for drainage must be provided as shown in the following figure.
c) The drain pump shall be fixed securely. Otherwise, abnormal noises will be generated.
Содержание GC201808-III
Страница 36: ...GREE GMV5 HR HEAT RECOVERY UNITS 32 Circuit diagram of GMV Q144WM B1 F U Circuit diagram of GMV Q168WM B1 F U ...
Страница 87: ...GREE GMV5 HR HEAT RECOVERY UNITS 83 1 External Connection for Individual Units ...
Страница 92: ...GREE GMV5 HR HEAT RECOVERY UNITS 88 ...
Страница 227: ...GREE GMV5 HR HEAT RECOVERY UNITS 223 Troubleshooting ...
Страница 286: ...GREE GMV5 HR HEAT RECOVERY UNITS 282 Troubleshooting ...
Страница 314: ...GREE GMV5 HR HEAT RECOVERY UNITS 310 4 Loosen the screws on the compressor drive as shown in the figure below ...
Страница 362: ...JF00302879 ...