Progress Description for Commissioning Phases
——
Commissioning Code Progress Code
Status Code
Meaning
Progress
LED1
LED2
LED3
Code
Display
Status
Code
Display
Status
Code
Display
Status
db
On
09
On
OC
On
The system detects that
refrigerants are normal and
automatically enters the next
step.
10_Pre-startup ODU
valve status detection
db
On
10
On
ON
On
Outdoor unit valves are being
opened.
db
On
10
On
U6
On
Outdoor unit valves have not
been completely opened.
db
On
10
On
OC
On
Outdoor unit valves have been
properly opened.
11_Manually calculated
refrigerant perfusion
status
db
On
11
On
AE
On
The refrigerant perfusion status is
manually calculated (appended
refrigerants must be accurately
calculated).
12_Unit commissioning
startup confirmation
db
On
12
On
AP
Blinking
The system waits for a unit
commissioning startup
command.
db
On
12
On
AE
On
The unit is set to
manually-calculated refrigerant
perfusion commissioning
operation status.
13_
——
——
——
——
——
—— No meaning.
14_
——
——
——
——
——
—— No meaning.
15_Cooling
operation by manual
perfusion
db
On
15
On
AC
On
The system is in cooling-mode
commissioning operation (the
system automatically selects the
commissioning operation mode
without needing manual
settings).
db
On
15
On
Corresponding
fault code
On
A fault occurs on the
cooling-mode commissioning
operation.
db
On
15
On
J0
On
A fault occurs on other modules
during the cooling-mode
commissioning operation.
db
On
15
On
U9
On
A fault occurs on ODU pipes or
valves.
db
On
15
On
XXXX/U8
On
The system detects pipe failure
of IDU. "XXXX" indicates the
project number of the faulty IDU.
The fault code "U8" is displayed
after three seconds. For
example, if a U8 fault occurs on
IDU 100, LED3 will circularly
display "01", "00" (two seconds
later), and "U8" (two seconds
later).
Содержание GC201808-III
Страница 36: ...GREE GMV5 HR HEAT RECOVERY UNITS 32 Circuit diagram of GMV Q144WM B1 F U Circuit diagram of GMV Q168WM B1 F U ...
Страница 87: ...GREE GMV5 HR HEAT RECOVERY UNITS 83 1 External Connection for Individual Units ...
Страница 92: ...GREE GMV5 HR HEAT RECOVERY UNITS 88 ...
Страница 227: ...GREE GMV5 HR HEAT RECOVERY UNITS 223 Troubleshooting ...
Страница 286: ...GREE GMV5 HR HEAT RECOVERY UNITS 282 Troubleshooting ...
Страница 314: ...GREE GMV5 HR HEAT RECOVERY UNITS 310 4 Loosen the screws on the compressor drive as shown in the figure below ...
Страница 362: ...JF00302879 ...