GREE GMV5 HR HEAT RECOVERY UNITS
323
Heat exchanging board
Precondition: No refrigerant exists in the pipeline system and the power supply has been disconnected.
Step
Diagram
Operation Procedure
5. Install a new heat
exchanging board.
●Screw the support of the heat
exchanging board and fix the board
onto the chassis.
●Put the heat exchanging board
based on the position of the suction
and discharge pipes and weld the
pipes with the heat exchanging
board.
●During welding, charge nitrogen
into the pipes. The pressure should
be controlled within 0.5±0.1 kgf/cm
2
(relative pressure).
Note: Avoid nearby parts from being
burnt during welding.
6. Fix and wire the
electric box.
●Put the electric box back to original
position and screw it.
●Connect all lines.
7. Check and install the
front panels.
●Check various parts and connecting
lines.
●If no problem is found, hook the
front panels and tighten the screws.
Assembly and Disassembly of Mode Exchanger
Take the one-to-two mode exchanger as an example
Step
Diagram
Operation Procedure
1
Remove the
cover plate
●
Remove 6 screws used for fixing
the cover plate, and then remove
the cover plate.
Содержание GC201808-III
Страница 36: ...GREE GMV5 HR HEAT RECOVERY UNITS 32 Circuit diagram of GMV Q144WM B1 F U Circuit diagram of GMV Q168WM B1 F U ...
Страница 87: ...GREE GMV5 HR HEAT RECOVERY UNITS 83 1 External Connection for Individual Units ...
Страница 92: ...GREE GMV5 HR HEAT RECOVERY UNITS 88 ...
Страница 227: ...GREE GMV5 HR HEAT RECOVERY UNITS 223 Troubleshooting ...
Страница 286: ...GREE GMV5 HR HEAT RECOVERY UNITS 282 Troubleshooting ...
Страница 314: ...GREE GMV5 HR HEAT RECOVERY UNITS 310 4 Loosen the screws on the compressor drive as shown in the figure below ...
Страница 362: ...JF00302879 ...