GREE GMV5 HR HEAT RECOVERY UNITS
40
3.1 Requirements for cooperation with civil engineering:
(1) The riser should be installed in the air conditioning tube well, and the horizontal pipe should be
placed in the ceiling, if possible.
(2) A place should be reserved for the ODU base to prevent the waterproof layer or insulating layer
on the roof from being damaged in later phase of installation.
(3) At places on walls or floors where pipes need to go through, holes or casing should be
preserved. If the pipe needs to go through a bearing beam, a steel casing must be prepared.
3.2 Requirements for cooperation with decoration engineering:
The air conditioning installation should not damage the bearing structure or the decorative style. Air
conditioning pipes should be laid out along the bottom of the beam as possible. If pipes meet one
another at the same elevation, process based on the following principles:
(1) Drain pipes enjoy the highest priority. Air ducts and pressure pipes should leave places for
gravity pipes.
(2) Air ducts and small pipes should leave places for major pipes.
3.3 Requirements for cooperation with electric:
After the capacity of air conditioning unit is determined, check the following aspects with relevant
electric design personnel:
(1) Whether the electrical load is designed based on the requirement of the air conditioning unit;
(2) Whether the power cable and circuit breaker meet the unit requirement and abide by relevant
national safety regulations;
(3) Whether the regional power supply quality (including voltage fluctuation and interference noise)
meet the international requirement;
(4) Any nonconformity must be resolved through coordination.
Содержание GC201808-III
Страница 36: ...GREE GMV5 HR HEAT RECOVERY UNITS 32 Circuit diagram of GMV Q144WM B1 F U Circuit diagram of GMV Q168WM B1 F U ...
Страница 87: ...GREE GMV5 HR HEAT RECOVERY UNITS 83 1 External Connection for Individual Units ...
Страница 92: ...GREE GMV5 HR HEAT RECOVERY UNITS 88 ...
Страница 227: ...GREE GMV5 HR HEAT RECOVERY UNITS 223 Troubleshooting ...
Страница 286: ...GREE GMV5 HR HEAT RECOVERY UNITS 282 Troubleshooting ...
Страница 314: ...GREE GMV5 HR HEAT RECOVERY UNITS 310 4 Loosen the screws on the compressor drive as shown in the figure below ...
Страница 362: ...JF00302879 ...