GREE GMV5 HR HEAT RECOVERY UNITS
159
conflict, may occur on different cooling systems. In such case, set project numbers of each system and
solve the fault as follows:
(1) Project number conflict:
When multiple systems are controlled in a centralized way, if two or more IDUs share the same
project number, the engineer number conflict occurs. In that case, IDUs cannot be switched to varied
modes or be turned on or off. The whole device cannot be started before the conflict is solved. The
commissioning software will show the following page:
Figure 1
Содержание GC201808-III
Страница 36: ...GREE GMV5 HR HEAT RECOVERY UNITS 32 Circuit diagram of GMV Q144WM B1 F U Circuit diagram of GMV Q168WM B1 F U ...
Страница 87: ...GREE GMV5 HR HEAT RECOVERY UNITS 83 1 External Connection for Individual Units ...
Страница 92: ...GREE GMV5 HR HEAT RECOVERY UNITS 88 ...
Страница 227: ...GREE GMV5 HR HEAT RECOVERY UNITS 223 Troubleshooting ...
Страница 286: ...GREE GMV5 HR HEAT RECOVERY UNITS 282 Troubleshooting ...
Страница 314: ...GREE GMV5 HR HEAT RECOVERY UNITS 310 4 Loosen the screws on the compressor drive as shown in the figure below ...
Страница 362: ...JF00302879 ...