GREE GMV5 HR HEAT RECOVERY UNITS
135
Progress Description for Commissioning Phases
——
Commissioning Code Progress Code
Status Code
Meaning
Progress
LED1
LED2
LED3
Code
Display
Status
Code
Display
Status
Code
Display
Status
16_Heating
operation by manual
perfusion
db
On
16
On
AH
On
The system is in heating-mode
commissioning operation (the
system automatically selects the
commissioning operation mode
without needing manual
settings).
db
On
16
On
Corresponding
fault code
On
A fault occurs on the
heating-mode commissioning
operation.
db
On
16
On
J0
On
A fault occurs on other modules
during the heating-mode
commissioning operation.
db
On
16
On
U9
On
A fault occurs on ODU pipes or
valves.
db
On
16
On
XXXX/U8
On
The system detects pipe failure
of IDU. "XXXX" indicates the
project number of the faulty IDU.
The fault code "U8" is displayed
after three seconds. For
example, if a U8 fault occurs on
IDU 100, LED3 will circularly
display "01", "00" (two seconds
later), and "U8" (two seconds
later).
17_Commissioning
completion status
01-04
On
OF
On
OF
On
The unit has completed
commissioning and in standby
status. LED1 displays the module
address; LED2 and LED3 display
"OF".
NOTE:
In commissioning status, press and hold "SW3" and "SW4" simultaneously for more than
five seconds to enter the no-wired-controller commissioning mode. In this mode, the system does not
detect the communication status between the wired controller and IDU.
3.3.2 Commissioning Operation Mode
The VRF provides three commissioning methods.
①
Commissioning through the main board of ODU.
②
Commissioning on a PC through professional software. Parameters of the ODU and IDU can
be simultaneously displayed and historical data can be stored and queried with the second
method. (For details about these methods, refer to respective instructions.)
③
Commissioning through the Portable Commissioning Tool(For details about these methods,
refer to respective instructions).
3.3.2.1 Commissioning Through the Main Board of ODU
When unit commissioning is performed through the main board of ODU, the main board provides
the following commissioning operation functions:
Step 1: Completely cover the front panel of ODU and open commissioning windows of all basic
modules.
Содержание GC201808-III
Страница 36: ...GREE GMV5 HR HEAT RECOVERY UNITS 32 Circuit diagram of GMV Q144WM B1 F U Circuit diagram of GMV Q168WM B1 F U ...
Страница 87: ...GREE GMV5 HR HEAT RECOVERY UNITS 83 1 External Connection for Individual Units ...
Страница 92: ...GREE GMV5 HR HEAT RECOVERY UNITS 88 ...
Страница 227: ...GREE GMV5 HR HEAT RECOVERY UNITS 223 Troubleshooting ...
Страница 286: ...GREE GMV5 HR HEAT RECOVERY UNITS 282 Troubleshooting ...
Страница 314: ...GREE GMV5 HR HEAT RECOVERY UNITS 310 4 Loosen the screws on the compressor drive as shown in the figure below ...
Страница 362: ...JF00302879 ...