307
amount.
Step 13: Vacuum-pump.
After lubricant is added, keep on extracting air through a vacuum pump till the internal pressure
reaches the absolute pressure 0kgf/cm
2
and the pressure gauge reads -1 kgf/cm
2
. This is to ensure that
moistures inside the pipeline system are completely vaporized.
Vacuum pumps of the specifications below are recommended:
Type
Max. Discharge Rate
Purpose
For air discharge
For vacuum drying
Lubricant driven pump
100L/min
Applicable
Applicable
Lubricant free pump
50L/min
Applicable
Applicable
Open all valves in order that the vacuum pump extracts air through all the valves, during which,
connect the units to a pressure gauge. When the internal pressure reaches 0kgf/cm
2
and the pressure
gauge reads -1kgf/cm
2
, keep on the extraction action for 0.5~1.0 hour more. Finally, turn off the rotary
switch of the gauge and close the pump. One hour later, if the pressure remains the same, fill refrigerant.
If the pressure increases to 0.1kgf/cm
2
or higher, conduct leakage check again.
Step 14: Fill refrigerant.
Before filling refrigerant, check its manufacturer, package, and print information. Besides, check
refrigerant pressure and quality against the saturation pressure / temperature list.
(1) Measure and check the pressure of the entire refrigerant product against the saturation
pressure / temperature list. Verify temperature parameter. If the difference between the actual
temperature and the parameter value is 3°C (37.4°F) or more, the refrigerant quality is
unsatisfactory.
(2) If the refrigerant is proved satisfactory, fill refrigerant of the combined amount of the rated
amount (specified on the nameplate) and the calculated refrigerant loss amount.
(3) For a multi-modular unit system, if only the refrigerant of an ODU is drawn out, add 80%
refrigerant of the rated fill amount (specified on the nameplate of the ODU) and start the system
for a debugging test.
Step 15: Install electric parts.
Install the electric box and connect various parts to the electric box by referring to the marks made
beforehand and the wiring diagram on the back of the box. Wire the compressors and corresponding
electric heating belts.
Note:
Wires should be checked against the wiring diagram beforehand so that they can be
connected correctly.
Step 16: Start for debugging.
Start the units and set them to run in refrigerating full-start, refrigerating single-start, heating full-start,
and heating single-start modes respectively. Duration for each running mode should be 30 minutes at
least. After the debug, analyze data and adjust the unit system, to ensure indexes of the entire system.
For details about each index, please consult after-sale persons and technicians.
Содержание GC201808-III
Страница 36: ...GREE GMV5 HR HEAT RECOVERY UNITS 32 Circuit diagram of GMV Q144WM B1 F U Circuit diagram of GMV Q168WM B1 F U ...
Страница 87: ...GREE GMV5 HR HEAT RECOVERY UNITS 83 1 External Connection for Individual Units ...
Страница 92: ...GREE GMV5 HR HEAT RECOVERY UNITS 88 ...
Страница 227: ...GREE GMV5 HR HEAT RECOVERY UNITS 223 Troubleshooting ...
Страница 286: ...GREE GMV5 HR HEAT RECOVERY UNITS 282 Troubleshooting ...
Страница 314: ...GREE GMV5 HR HEAT RECOVERY UNITS 310 4 Loosen the screws on the compressor drive as shown in the figure below ...
Страница 362: ...JF00302879 ...