![Gree GC201808-III Скачать руководство пользователя страница 330](http://html.mh-extra.com/html/gree/gc201808-iii/gc201808-iii_service-manual_2260766330.webp)
GREE GMV5 HR HEAT RECOVERY UNITS
326
PART 4 APPENDIXES
1 MINUTES ABOUT A DEBUG SOLUTION
CONFIRMATION MEETING
Confirming air conditioner debug solution to the *** project
Theme: ***
Time: ***
Place: ***
Participants: ***
Contents: ***
1
2
3
2 VISUAL INSPECTION CHECKLIST OF
THE DEBUG SYSTEM
Visual inspection checklist of *** air conditioning equipment
Item
Problem
Checked by
Check time
Refrigerating system
Appearance of ODUs
Appearance of IDUs
Thermal insulation of copper pipes
Discharge system
Thermal insulation of condensing pipes
Electric system
Power line diameter
Cabling of power lines
Air circuit breaker
Communication system
Materials of communication lines
Connection of communication lines
3 DEBUG PARAMETER RECORD LIST
Project name
Unit model
Debugged by
Date
ODU rated capacity
(kW)
General IDU rated
capacity (kW)
Total length of refrigerant
pipes (m)
Maximum fall of IDUs
(m)
Fill amount of refrigerant (kg)
Debug state: Refrigerating Heating Number and capacity of running IDUs
State parameter
Unit
Prestart
30min
60min
90min
ODU
Outdoor temperature
°F
Power voltage
V
Frequency
Hz
Compressor current
A
Discharge temperature
°F
System temperature
under high pressure
°F
Содержание GC201808-III
Страница 36: ...GREE GMV5 HR HEAT RECOVERY UNITS 32 Circuit diagram of GMV Q144WM B1 F U Circuit diagram of GMV Q168WM B1 F U ...
Страница 87: ...GREE GMV5 HR HEAT RECOVERY UNITS 83 1 External Connection for Individual Units ...
Страница 92: ...GREE GMV5 HR HEAT RECOVERY UNITS 88 ...
Страница 227: ...GREE GMV5 HR HEAT RECOVERY UNITS 223 Troubleshooting ...
Страница 286: ...GREE GMV5 HR HEAT RECOVERY UNITS 282 Troubleshooting ...
Страница 314: ...GREE GMV5 HR HEAT RECOVERY UNITS 310 4 Loosen the screws on the compressor drive as shown in the figure below ...
Страница 362: ...JF00302879 ...