GREE GMV5 HR HEAT RECOVERY UNITS
38
CHAPTER 2 INSTALLATION
PART 1 ENGINEERING INSTALLATION
PREPARATION
1 INSTALLATION SAFETY
Personnel and property safety are highly concerned during the entire installation process.
Installation implementation must abide by relevant national safety regulations to ensure personnel and
property safety.
All personnel involved in the installation must attend safety education courses and pass
corresponding safety examinations before installation. Only qualified personnel can attend the
installation. Relevant personnel must be held responsible for any violation of the regulation.
2 IMPORTANCE OF INSTALLATION
ENGINEERING
VRF air conditioning systems use refrigerant, instead of other agent, to directly evaporate to carry
out the system heat. High level of pipe cleanness and dryness is required in the system. Since various
pipes need to be prepared and laid out onsite, carelessness or maloperation during installation may
leave impurities, water, or dust inside refrigerant pipes. If the design fails to meet the requirement,
various problems may occur in the system or even lead to system breakdown.
Problems that usually occur during installation are as follows:
No.
Installation Problem
Possible Consequence
1
Dust or impurities enter into the
refrigeration system.
Pipes are more likely to be blocked; air conditioning performance is reduced;
compressor wear is increased
or even hinder the normal operation of the system and burn the compressor.
2
Nitrogen is not filled into the
refrigerant pipe or insufficient
Nitrogen is filled before welding.
Pipes are more likely to be blocked; air conditioning performance is reduced;
compressor wear is increased
or even hinder the normal operation of the system and burn the compressor.
3
The vacuum degree in the
refrigerant pipe is insufficient.
The refrigeration performance is reduced. The system fails to keep normal
operation due to frequent protection measures. When the problem getting
serious, compressor and other major components can be damaged.
4
Water enters into the refrigeration
system.
Copper plating may appear on the compressor and reduce the compressor
efficiency with abnormal noise generated; failures may occur in the system
due to ice plug.
5
The refrigerant pipe specifications
do not meet the configuration
requirements.
Smaller configuration specifications can increase the system pipe resistance
and affect the cooling performance; larger configuration specifications are
waste of materials and can also reduce the cooling performance.
6
Refrigerant pipe is blocked.
The cooling performance is reduced; in certain cases,
it may cause long-term compressor operating under overheat conditions; the
lubricating effect can be affected and the compressor may be burnt if
impurities were mixed with the lubricating oil.
7
Refrigerant pipe exceeds the limit.
The loss in pipe is considerable and the unit energy efficiency decreases,
which are harmful for long-term running of the system.
Содержание GC201808-III
Страница 36: ...GREE GMV5 HR HEAT RECOVERY UNITS 32 Circuit diagram of GMV Q144WM B1 F U Circuit diagram of GMV Q168WM B1 F U ...
Страница 87: ...GREE GMV5 HR HEAT RECOVERY UNITS 83 1 External Connection for Individual Units ...
Страница 92: ...GREE GMV5 HR HEAT RECOVERY UNITS 88 ...
Страница 227: ...GREE GMV5 HR HEAT RECOVERY UNITS 223 Troubleshooting ...
Страница 286: ...GREE GMV5 HR HEAT RECOVERY UNITS 282 Troubleshooting ...
Страница 314: ...GREE GMV5 HR HEAT RECOVERY UNITS 310 4 Loosen the screws on the compressor drive as shown in the figure below ...
Страница 362: ...JF00302879 ...