
343
7
Repairing the knitting machine
7.3 Replacing parts
5. Releasing the rear needle bed for gauge E 10 - E 18: Remove the
screws (3). Push the connection (4) to the side. While doing so, the
impulse sensor rail is pushed to the side.
Link of the impulse sensor rail
Remove needle bed or
position it at an angle
1. Front needle bed: Swivel towards the front carefully and lean it against
the machine covering.
2. Rear needle bed: Remove the needle bed from the machine with two
persons.
Screwing on needle bed tight
Installing front and rear needle beds
➜
Reassemble the needle bed in the reverse order. When doing so, make
sure that the needle bed contacts the pin (4) and the roller (5).
Summary of Contents for CMS 730 S
Page 12: ...8 ...
Page 58: ...Description of knitting machine 2 Display and operating elements 2 8 54 ...
Page 110: ...Producing with the knitting machine 3 Starting the machine after a fault 3 6 106 ...
Page 390: ...Repairing the knitting machine 7 Needle selection shifting 7 6 386 ...
Page 444: ...Yarns and stitch tension 9 Conversion table 9 4 440 ...
Page 460: ...Machine Management Tools 10 Send email directly from the machine 10 4 456 ...
Page 468: ...Key word directory 11 464 ...