
337
7
Repairing the knitting machine
7.3 Replacing parts
7.3.1
Replacing needle and coupling part
Replacing needle and coupling part
1. Pull-out the needle rail (1) with the extraction hook (6).
2. Pull needle (2) upwards, the coupling part (3) will, with it, also be pulled
upwards.
3. When the butt of the coupling parts (4) bumps into the holding-down
jack bed, press the coupling part downward. Pull out the needle and
coupling part upward.
4. Assemble the new needle and coupling part.
5. To mount the new needle and coupling part, push the butt of the
coupling part through into the needle bed under the jack bed. While
doing so, make sure that the needle is guided in above the knock-over
wire.
Summary of Contents for CMS 730 S
Page 12: ...8 ...
Page 58: ...Description of knitting machine 2 Display and operating elements 2 8 54 ...
Page 110: ...Producing with the knitting machine 3 Starting the machine after a fault 3 6 106 ...
Page 390: ...Repairing the knitting machine 7 Needle selection shifting 7 6 386 ...
Page 444: ...Yarns and stitch tension 9 Conversion table 9 4 440 ...
Page 460: ...Machine Management Tools 10 Send email directly from the machine 10 4 456 ...
Page 468: ...Key word directory 11 464 ...