
2. SETTING PROCEDURE TO OPERATION
2-4
IMS01T28-E4
2.2 When Performing Operation Setting
via Loader Communication
Conduct necessary setting before operation according to the procedure described below.
The Loader port is only for parameter setup.
A communication program must be created in order to use Loader communication.
RKC communication protocol can be used for the communication protocol. To connect
to the host computer, our COM-K USB communication converter and a loader
communication cable (optional) are required.
[Communication support tool]
PROTEM2: Communication tool for SRZ
The PROTEM2 can be downloaded from the RKC official website:
https://www.rkcinst.com/.
For RKC communication protocol, refer to
6. RKC COMMUNICATION (P. 6-1)
.
Set the Z-TIO-G module address.
Refer to
3.1 Module Address Setting (P. 3-2)
.
Set the communication settings of Z-TIO-G module by the DIP switch.
For the DIP switch setting, refer to
3.2 Protocol Selections and Communication
Speed Setting (P. 3-4)
.
Mount the Z-TIO-G module or SRZ unit on the DIN rail or panel.
Refer to
4. MOUNTING (P. 4-1)
.
Wire the power supply and input/output.
Refer to
5. WIRING (P. 5-1)
.
Preparation of
communication program
A
Module address setting
Communication setting
Mounting
Wiring of SRZ unit
Summary of Contents for Z-TIO-G
Page 8: ...i 6 IMS01T28 E4 MEMO...
Page 16: ...IMS01T28 E4 1 8 MEMO...
Page 22: ...2 6 IMS01T28 E4 MEMO...
Page 34: ...4 MOUNTING 4 4 IMS01T28 E4 4 2 Dimensions Terminal type module 85 100 5 Unit mm 30 6 7...
Page 52: ...5 14 IMS01T28 E4 MEMO...
Page 82: ...7 18 IMS01T28 E4 MEMO...
Page 211: ...TROUBLE SHOOTING IMS01T28 E4 10 1 10 1 Solutions for Problems 10 2...
Page 216: ...10 6 IMS01T28 E4 MEMO...
Page 217: ...SPECIFICATIONS IMS01T28 E4 11 1...
Page 230: ...11 14 IMS01T28 E4 MEMO...
Page 244: ...A 4 IMS01T28 E4 MEMO...
Page 245: ...The first edition SEP 2012 IMQ00 The fourth edition FEB 2019 IMQ00...