Computing the Cycle Time
Section 2-7
executed in order of priority after the current interrupt task has completed
execution and the software interrupt response time has elapsed.
The interrupt response time of input interrupt tasks is calculated as follows:
Interrupt response time = Input ON delay + Software interrupt response time
Scheduled Interrupt Tasks
The interrupt response time of scheduled interrupt tasks is the time taken
from after the scheduled time specified by the MSKS(690) instruction has
elapsed until the interrupt task has actually been executed. The length of the
interrupt response time for scheduled interrupt tasks is 1 ms max. There is
also an error of 80
µ
s in the time to the first scheduled interrupt (0.5 ms min.).
Note
Scheduled interrupt tasks can be executed during execution of the user pro-
gram (even while an instruction is being executed by stopping the execution of
an instruction), I/O refresh, peripheral servicing, or overseeing. The interrupt
response time is not affected by which of the above processing operations
during which the scheduled interrupt time occurs. Scheduled interrupts, how-
ever, are not executed during execution of other interrupt tasks even if the
interrupt conditions are satisfied. Instead, the interrupts are executed in order
of priority after the current interrupt task has completed execution and the
software interrupt response time has elapsed.
2-7-9
Serial PLC Link Response Performance
The response times for CPU Units connected via a Serial PLC Link (master to
slave or slave to master) can be calculated as shown below. If a PT is in the
Serial PLC Link, however, the amount of communications data will not be
fixed and the values will change.
• Maximum I/O response time (not including hardware delay) =
Master cycle time + Communications cycle time + Slave cycle time + 4 ms
• Minimum I/O response time (not including hardware delay) =
Slave communications time + 0.8 ms
Input
(Interrupt signal retrieval)
Interrupt task execution
Input interrupt task
response time
Software interrupt response time
Input ON delay
Cyclic task execution
(main program)
Ladder program
execution time
Return time from
input interrupt task
Next interrupt signal
can be accepted.
The time from completing the ladder program in the input
interrupt task until returning to cyclic task execution is 60
μ
s.
Software interrupt response time
Internal timer
Scheduled interrupt task
Scheduled interrupt time
Summary of Contents for CP1L CPU UNIT - 03-2009
Page 1: ...Cat No W462 E1 06 CP1L CPU Unit SYSMAC CP Series CP1L L_0D_ CP1L M_0D_ OPERATION MANUAL...
Page 2: ......
Page 4: ...iv...
Page 10: ...x...
Page 22: ...xxii...
Page 34: ...xxxiv Conformance to EC Directives 6...
Page 70: ...36 Function Blocks Section 1 5...
Page 584: ...550 Trouble Shooting Section 8 7...
Page 627: ...593 Sample Application Section 9 12 Network Settings Network Tab Network Settings Driver Tab...
Page 630: ...596 Sample Application Section 9 12...
Page 654: ...620 Troubleshooting Unit Errors Section 11 4...
Page 662: ...628 Replacing User serviceable Parts Section 12 2...
Page 668: ...634 Standard Models Appendix A...
Page 698: ...664 Auxiliary Area Allocations by Function Appendix C...
Page 746: ...712 Auxiliary Area Allocations by Address Appendix D...
Page 773: ...739 Connections to Serial Communications Option Boards Appendix F Connecting to Unit...
Page 774: ...740 Connections to Serial Communications Option Boards Appendix F...
Page 806: ...772 Index...
Page 808: ...774 Revision History...