3-2 Setting the Routing Tables
3-2-10 Transferring Routing Tables to a Network PLC through a Direct Serial Connection
3-30
•
Controller Link or SYSMAC Link data link network:
The nodes connected to the network are listed in the pull-down list in the
Node
Field. Select the destination node address from the pull-down list.
•
Ethernet or DeviceNet network
Specify the destination node’s node address directly in the
Node Address
Field.
If a node address is specified and that node is connected even once, the
node will be added to the pull-down list in the
Node
Field the next time the
dialog box is opened.
Setting Example:
In this example, the tables are transferred to node address 2 in the Controller Link
network connected to the Controller Link Unit with unit number 1.
Computer (CX-Integrator)
Unit number 1:
Controller Link Unit
Direct serial connection
Node address 2
Connect online with
network address = 0, and
node address = 0.
Controller Link
Transfer destination
is this PLC.
Make the settings in the Switching the target PLC Dialog Box, as shown in the
following diagram.
Select
01 Controller Link
from
the pull-down list.
Select
2
.
Select the
Connect to
the
PLC
on the Network
Option.
7. Select
Options – Transfer to PLC
.
8. The following dialog box will be displayed to confirm the transfer. Verify that it is all
right to proceed with the transfer to the PLC, click the
Yes
Button.
Note
If routing tables were previously set in the target PLC, those tables will be overwritten
with the routing table that is being edited. Verify that the routing tables are being
written to the correct PLC.
9. The routing tables (local network table and relay network table) will be transferred
from the CX-Integrator to PLC2.
The following dialog box will be displayed after the transfer is completed.
Summary of Contents for CJ Series
Page 2: ......
Page 3: ...CXONE AL C V3 CXONE AL D V3 CX Integrator Ver 2 3 Operation Manual Revised February 2009 ...
Page 4: ...iv ...
Page 6: ...vi ...
Page 18: ...xviii ...
Page 154: ...Communications Section 3 Routing Tables This section describes how to set the routing tables ...
Page 189: ...3 3 Maintenance after Network Configuration 3 3 2 Editing the FINS Local Network Tables 3 36 ...
Page 244: ...Communications Section 5 Ethernet This section describes the operations specific to Ethernet ...
Page 249: ...5 2 Ping Test 5 2 2 Procedure 5 6 ...
Page 353: ...7 8 Other CompoNet Functions 7 8 2 Installing Expansion Modules 7 32 ...
Page 404: ...Appendices ...
Page 407: ...A 1 CPS File Management A 1 1 Description of CPS Files A 4 ...
Page 413: ......
Page 414: ......
Page 415: ......