10-2
Echoback Test between Nodes
10-2-4 Executing an Echoback Test between Nodes
10-23
Field
Item
Contents
Success
Displays the number of test successes. If set for “Frequency
is not specified,” a “-“ is displayed.
Test Results
Failure
Displays the number of test failures. The test is ended when
1,000 failures is reached.
Max (ms)
Displays the maximum response time.
Min (ms)
Displays the minimum response time.
Response time
Average (ms)
Displays the average response time. If set for “Frequency is
not specified,” the display shows the average for the last ten
times.
10-2-4 Executing an Echoback Test between Nodes
1. While online, open the Online Connection Information Window, right-click the target
PLC or Unit, and select
Echoback test between PLC nodes
from the pop-up
menu.
The PLC Internode Echoback Test Dialog Box will be displayed.
2. Input (or confirm) the target item, and click the
Connect
Button.
The connection results will be displayed.
Summary of Contents for CJ Series
Page 2: ......
Page 3: ...CXONE AL C V3 CXONE AL D V3 CX Integrator Ver 2 3 Operation Manual Revised February 2009 ...
Page 4: ...iv ...
Page 6: ...vi ...
Page 18: ...xviii ...
Page 154: ...Communications Section 3 Routing Tables This section describes how to set the routing tables ...
Page 189: ...3 3 Maintenance after Network Configuration 3 3 2 Editing the FINS Local Network Tables 3 36 ...
Page 244: ...Communications Section 5 Ethernet This section describes the operations specific to Ethernet ...
Page 249: ...5 2 Ping Test 5 2 2 Procedure 5 6 ...
Page 353: ...7 8 Other CompoNet Functions 7 8 2 Installing Expansion Modules 7 32 ...
Page 404: ...Appendices ...
Page 407: ...A 1 CPS File Management A 1 1 Description of CPS Files A 4 ...
Page 413: ......
Page 414: ......
Page 415: ......