8-2
CompoWay/F Slaves Connected to a PLC
8-2-1
Communications with CompoWay/F Slaves through a PLC
8-6
The CX-Integrator will check all 100
node addresses for nodes, so the
transfer will take about 35 minutes.
If you already know the node address
range, select the
Selection
Option,
specify the node search range, and start
the transfer.
The CompoWay/F Slave upload starts when the
OK
Button is clicked.
8. The following dialog box will be displayed when the CompoWay/F Slave transfer is
completed.
Click the
OK
Button.
The following dialog box will be displayed if no CompoWay/F Slaves could be
found.
Click the
OK
Button.
9. A CompoWay/F Slave (such as a Temperature Controller) connected directly to the
CPU Unit’s built-in RS-232C serial port is displayed in the Network Configuration
Window along with a PLC.
At the same time, a new CompoWay/F network is added in the Workspace
Window.
Summary of Contents for CJ Series
Page 2: ......
Page 3: ...CXONE AL C V3 CXONE AL D V3 CX Integrator Ver 2 3 Operation Manual Revised February 2009 ...
Page 4: ...iv ...
Page 6: ...vi ...
Page 18: ...xviii ...
Page 154: ...Communications Section 3 Routing Tables This section describes how to set the routing tables ...
Page 189: ...3 3 Maintenance after Network Configuration 3 3 2 Editing the FINS Local Network Tables 3 36 ...
Page 244: ...Communications Section 5 Ethernet This section describes the operations specific to Ethernet ...
Page 249: ...5 2 Ping Test 5 2 2 Procedure 5 6 ...
Page 353: ...7 8 Other CompoNet Functions 7 8 2 Installing Expansion Modules 7 32 ...
Page 404: ...Appendices ...
Page 407: ...A 1 CPS File Management A 1 1 Description of CPS Files A 4 ...
Page 413: ......
Page 414: ......
Page 415: ......