4-3
Manually Setting Data Links
4-3-11 Transferring the Data Link Table
4-34
4-3-11 Transferring the Data Link Table
There are two methods that can be used to transfer data link tables.
•
Transfer data link tables to all PLC nodes on the network at the same time.
•
Transfer data link tables to an individual PLC node on the network at the same time.
Transferring to All Nodes on the Network
1 Select
Set All Nodes for Network Operation
from the Datalink Component’s
Online Menu. Selecting this operation allows the data link tables to be transferred
simultaneously to multiple PLCs.
Confirm that there is a
check mark.
2 Select
Online - Transfer to PL
C
. The following dialog box will be displayed.
3 Click
the
Yes
Button.
An error list will be displayed.
4 If there are no errors, click the
OK
Button. The data link tables will be transferred to
all PLC nodes and then the transfer results will be displayed.
Summary of Contents for CJ Series
Page 2: ......
Page 3: ...CXONE AL C V3 CXONE AL D V3 CX Integrator Ver 2 3 Operation Manual Revised February 2009 ...
Page 4: ...iv ...
Page 6: ...vi ...
Page 18: ...xviii ...
Page 154: ...Communications Section 3 Routing Tables This section describes how to set the routing tables ...
Page 189: ...3 3 Maintenance after Network Configuration 3 3 2 Editing the FINS Local Network Tables 3 36 ...
Page 244: ...Communications Section 5 Ethernet This section describes the operations specific to Ethernet ...
Page 249: ...5 2 Ping Test 5 2 2 Procedure 5 6 ...
Page 353: ...7 8 Other CompoNet Functions 7 8 2 Installing Expansion Modules 7 32 ...
Page 404: ...Appendices ...
Page 407: ...A 1 CPS File Management A 1 1 Description of CPS Files A 4 ...
Page 413: ......
Page 414: ......
Page 415: ......