2-3
Uploading Network Configurations and Checking for Communications Unit Errors
2-3-2 Procedure
2-26
upload is executed, an OMRON FINS command is sent to all nodes in the segment.
Therefore, if a node exists for something other than an OMRON Ethernet Unit or
FinsGateway, the FINS command will not be received at that node and unexpected
operation may occur.
4. The network configuration uploaded from the Unit will be displayed in the Network
Configuration Window.
The target PLC is displayed
with a green border.
The window
background will be
gray when online.
5. Check the connection status of the nodes. To check the CPU Unit and
Communications Units for errors, right-click the node in the Network Configuration
Window and select
Error Log
or
Status/Error of Communication Unit
from the
pop-up menu.
Note
Confirming Relay Points between Networks
The System Overview Tab Page shows the relay points between networks. The
relationship between the relay points for all networks can be understood on one
display.
Summary of Contents for CJ Series
Page 2: ......
Page 3: ...CXONE AL C V3 CXONE AL D V3 CX Integrator Ver 2 3 Operation Manual Revised February 2009 ...
Page 4: ...iv ...
Page 6: ...vi ...
Page 18: ...xviii ...
Page 154: ...Communications Section 3 Routing Tables This section describes how to set the routing tables ...
Page 189: ...3 3 Maintenance after Network Configuration 3 3 2 Editing the FINS Local Network Tables 3 36 ...
Page 244: ...Communications Section 5 Ethernet This section describes the operations specific to Ethernet ...
Page 249: ...5 2 Ping Test 5 2 2 Procedure 5 6 ...
Page 353: ...7 8 Other CompoNet Functions 7 8 2 Installing Expansion Modules 7 32 ...
Page 404: ...Appendices ...
Page 407: ...A 1 CPS File Management A 1 1 Description of CPS Files A 4 ...
Page 413: ......
Page 414: ......
Page 415: ......