10-1 Controller
Link
Network Diagnostic Tool
10-1-1 Diagnostic Functions and Flowcharts
10-3
Operational Flowchart
Connect online to the Controller Link Unit in
the target PLC and upload the network
configuration.
Select
Tools – Controller Link tool –
Network Diagnosis
to start the Controller
Link Network Diagnostic Tool.
If the Change Network Dialog Box is displayed,
select the network to be diagnosed.
(See note 2.)
Node diagnosis will be performed
automatically.
(See note 3.)
Select the desired diagnosis operation from
the
Diagnosis
Menu.
1. Connect
2. Start
3. Select Network
4. Execute
Diagnostics
5. Select
Diagnosis
Operation
Refer to
2-3 Uploading Network Configurations and
Checking for Communications Unit Errors
for details on
connecting online and uploading the network
configuration.
Using a CS/CJ/CP-series PLC in a Toolbus
network (See note 1.):
Note 1:
If the PLC is a CS/CJ/CP-series
model and the network type is
Toolbus, it isn’t necessary to set
the PLC connection. The
CX-Integrator will connect to the
PLC when the automatically when
the Controller Link Network
Diagnostic Tool starts.
Note 2:
The Change Network Dialog Box is displayed
only if there are two or more networks
available for diagnosis. (If dialog box will not
be displayed if there is just one Controller Link
Unit in the PLC or the relay network table is
not registered.)
Note 3:
The confirmation dialog box will be displayed
if the CX-Integrator is connected to the
network to be diagnosed. This operation is
used to list the nodes in the network and
diagnose each node’s status (normal/error).
Click the
No
Button to cancel the network
status diagnosis in order to execute another
operation such as diagnosing a disconnection.
Summary of Contents for CJ Series
Page 2: ......
Page 3: ...CXONE AL C V3 CXONE AL D V3 CX Integrator Ver 2 3 Operation Manual Revised February 2009 ...
Page 4: ...iv ...
Page 6: ...vi ...
Page 18: ...xviii ...
Page 154: ...Communications Section 3 Routing Tables This section describes how to set the routing tables ...
Page 189: ...3 3 Maintenance after Network Configuration 3 3 2 Editing the FINS Local Network Tables 3 36 ...
Page 244: ...Communications Section 5 Ethernet This section describes the operations specific to Ethernet ...
Page 249: ...5 2 Ping Test 5 2 2 Procedure 5 6 ...
Page 353: ...7 8 Other CompoNet Functions 7 8 2 Installing Expansion Modules 7 32 ...
Page 404: ...Appendices ...
Page 407: ...A 1 CPS File Management A 1 1 Description of CPS Files A 4 ...
Page 413: ......
Page 414: ......
Page 415: ......