1-4
PLC Connecting Cables
1-4-2
Connecting CJ-series CJ2 CPU Units, CP-series PLCs and NSJ-series Controllers
Using Commercially Available USB Cable
1-30
3. The following dialog box will be displayed. Select the
Search for a suitable driver for
the device (recommended)
Option and then click the
Next
Button.
4. The following dialog box will be displayed. From the list in the dialog box, select the
Specify location
Checkbox and then click the
Next
Button.
5. Click the
Browse
Button, specify C:\Program Files\OMRON\CX-Server\USB\
win2000_XP\Inf, and then click the
Next
Button. (“C:\” indicates the installation drive
and may be different on your computer.)
6. A search will be made for the driver and the following dialog box will be displayed.
Click the
Next
Button. The driver will be installed.
Summary of Contents for CJ Series
Page 2: ......
Page 3: ...CXONE AL C V3 CXONE AL D V3 CX Integrator Ver 2 3 Operation Manual Revised February 2009 ...
Page 4: ...iv ...
Page 6: ...vi ...
Page 18: ...xviii ...
Page 154: ...Communications Section 3 Routing Tables This section describes how to set the routing tables ...
Page 189: ...3 3 Maintenance after Network Configuration 3 3 2 Editing the FINS Local Network Tables 3 36 ...
Page 244: ...Communications Section 5 Ethernet This section describes the operations specific to Ethernet ...
Page 249: ...5 2 Ping Test 5 2 2 Procedure 5 6 ...
Page 353: ...7 8 Other CompoNet Functions 7 8 2 Installing Expansion Modules 7 32 ...
Page 404: ...Appendices ...
Page 407: ...A 1 CPS File Management A 1 1 Description of CPS Files A 4 ...
Page 413: ......
Page 414: ......
Page 415: ......