①
↓
1.
Remove the connection cable for the load cell from the terminal block for load cells.
2.
Measure the voltage between A-C after short-circuiting A-F and C-G of terminal
block.
Set the load cell tester to DC voltage measurement.
↓
The voltage between
A and C is stable in
the set value of ex-
citation voltage.
→ No → Contact Minebea Intec.
↓
Yes
↓
1.
Reconnect the load cell to the terminal block.
2.
Conirm the output voltage of the load cell, refer to Chapter
.
↓
Monitoring display
exceeds the range
from -3.1 mV/V to 3.1
mV/V
→ Yes → Shorten between B
and D in the
connector
↓
No
↓
↓
Re-calibrate accor-
ding to the procedu-
res in Chapter
.
Monitoring display
exceeds the range
from -3.1 mV/V to
3.1 mV/V
→ No →
↓
↓
↓
Yes
↓
Same condition
→ Yes →
↓
No
↓
Start weighing
Inform Minebea In-
tec about the cont-
ens of failure and
situation at site in
details.
Following causes can
be considered.
-
The load cell in-
put exceeds the
range of -3.1 mV/
V to 3.1 mV/V.
-
The load cell is
boken, e.g. due
to overloading.
-
The signal wire to
the load cell is
not connected.
Weight indicator CSD-903
20 Troubleshooting
EN-220
Minebea Intec
Summary of Contents for CSD-903
Page 243: ......