background image

Operators & 

Installation Guide

Summary of Contents for Q1

Page 1: ...Operators Installation Guide...

Page 2: ...nstalled please leave operation and installation manual with the customer WARNING Only operate the Quest Q1 when you have the pool pump switched on and you have water flowing through the ioniser oxidi...

Page 3: ...Initial System Start Up 9 4 Maintenance 10 4 1 Basic Maintenance 4 1 1 Fuse 4 1 2 Adjustment of Copper Silver Electrodes 4 1 3 Replacement of Electrodes 5 Specifications Warranty and Contacts 12 5 1...

Page 4: ...ou for purchasing your Quest Q 1 freshwater pool sanitiser Follow the instructions below and you will enjoy the benefits of low maintenance and the exceptional water quality achievable with this syste...

Page 5: ...clear of obstructions To loniser To Oxidiser To EM Descaler Timer Clock Fuse Pump Outlet Off Manual Auto switch EM Descaler Indicator LED Digital Display Oxidiser Current Control Ioniser Polarity Indi...

Page 6: ...ambers can be installed in two different formats Horizontal and in a H shape both chambers are connected by the descaler coupling This design is designed for the pool engineer to choose the most suita...

Page 7: ...ition the Q1 internal electronics are controlled by the Auto Off Manual switch as below The Auto Off Manual switch controls the supply to the Q1 pump outlet and to Q1 internal electronics when the Off...

Page 8: ...m a lower current value will be displayed OF The current being applied to the plates is negligible or non existent This will be the most likely reading when the Oxidiser Current Control is set to mini...

Page 9: ...ths until the concrete has fully cured The pH of your pool water is increased by adding sodium bi carbonate and reduced by adding hydrochloric acid or sodium bisulphate dry acid Dry acid at the rate o...

Page 10: ...effective at eradicating bacteria that traditional chlorine sanitiser chemical treatments The required levels of Copper and Silver introduced to the swimming pool is well below acceptable drinking wat...

Page 11: ...on the pool pump so that water is flowing through the filtration system the Q 1 ionisation oxidation chambers 2 Make sure that the ionisation oxidation chamber is filled with water 3 Turn both contro...

Page 12: ...and oxidiser plates are self cleaning but are consumable and require periodic adjustment and replacement The EM Descaler system is maintenance free 4 1 1 Fuse Fuse replacement 240 Volt 10 Amp Slow Bl...

Page 13: ...ors including pool use maintenance dirt and other debris in the pool Typically both the electrodes and oxidiser will last for around two to three years before replacement Only replacement components s...

Page 14: ...hamber A build up of hazardous gases will be generated and will result in damage The Oxidiser and Ioniser cells are consumable and as such are not covered under the warranty If you are using another p...

Page 15: ...opriate to fit l PVC Pipe cleaner primer and adhesive l Cable ties l Mounting screws for control Unit Recommended Tools Only basic tools are required for implementation l PVC Pipe Saw l Electric drill...

Page 16: ...ialist algaecide DDAC and hydrogen peroxide Do not install Q1 with existing pool water It is essential that the pool is completely drained and that any filter media is replaced Salt Water Chlorinator...

Page 17: ...properly no or very little chlorine will be dispensed as the ORP levels should always be adequate Note When installing Q 1 with Chemical Feeders ensure that the Q 1 Wet end Cell is installed so that...

Page 18: ...Installation Guide 16...

Page 19: ...ability to easily reach the Wet Cell All cables are approximately 2 metres long The ideal sequence and flow for the water treatment components is water in Pump Filter Heater Oxidiser Descaler Ioniser...

Page 20: ...e flooded sprayed with water or come into contact with chemicals Mount the control box where all cables will reach the power source or components to be connected It is not recommended to extend cablin...

Page 21: ...m the Filter or heater where installed and before any Automatic Chemical Feeders see above Install so that the inflow is over the Oxidiser plates and the outflow is from the Ioniser Electrode end Ensu...

Page 22: ...id solution See section 1 1 2 Pool Balance Adjusting water hardness Reduce pH Refer section 1 1 2 Oxidiser production display flashing Pb The system has detected a lack of water in the oxidiser cell t...

Page 23: ...ndustrial Estate Lutterworth Leicestershire LE175QZ England Email sales questsemi com Tel 44 0 1162479794 Global Sales Office Queensland Semiconductor Technologies Pty Ltd QUEST Unit 5 1 Maid Street S...

Page 24: ...www questpools com au YOUR AUTHORISED QUEST RESELLER IS...

Reviews: