Step 1542-6
The
Eserver
pSeries 670 server must have a minimum of one I/O subsystem and one media subsystem
attached to the processor subsystem. The following steps reduce the system I/O to the required minimum
of one I/O subsystem:
1. Turn off the system power.
2. Verify that processor subsystem RIO port A0 on primary I/O book (U1.18-P1-H2/Q1) is connected to
I/O subsystem 1 left I/O port connector 0 (U1.9-P1/Q2).
3. Verify that I/O subsystem 1 right I/O port connector 1 (U1.9-P2/Q1) is connected to processor
subsystem RIO port A1 on primary I/O book (U1.18-P1-H2/Q2).
4. Verify that I/O subsystem 1 left I/O port connector 1 (U1.9-P1/Q1) is connected to I/O subsystem 1
right I/O port connector 0 (U1.9-P2/Q2).
5. Disconnect cable at processor subsystem RIO port B0 on primary I/O book (U1.18-P1-H2/Q3), if
cable attached.
6. Disconnect cable at processor subsystem RIO port B1 on primary I/O book (U1.18-P1-H2/Q4), if
cable attached.
7. Unplug the secondary I/O book (U1.18-P1-H3), if present, and carefully pull it approximately 25 mm
(1 inch) away from the backplane without disconnecting any cables
8. Unplug the third I/O book (U1.18-P1-H4), if present, and carefully pull it approximately 25 mm (1 inch)
away from the backplane without disconnecting any cables.
9. Connect the previously removed RIO cable from I/O subsystem 1 right I/O port connector 1
(U1.9-P2/Q1) to processor subsystem RIO port A1 on primary I/O book (U1.18-P1-H2/Q2).
10. Verify that the power cable is connected between I/O subsystem 1 right media subsystem power
connector (U1.9-P2-V1/Q3) and the media subsystem.
11. Disconnect power cables from remaining I/O subsystems.
All I/O subsystems except the primary I/O subsystem should now be physically disconnected from the
processor subsystem.
Go to “Step 1542-7” on page 266.
Chapter 3. Maintenance Analysis Procedures
265
Summary of Contents for pSeries 670
Page 1: ...pSeries 670 Service Guide SA38 0615 03 ERserver...
Page 2: ......
Page 3: ...pSeries 670 Service Guide SA38 0615 03 ERserver...
Page 12: ...x Eserver pSeries 670 Service Guide...
Page 16: ...xiv Eserver pSeries 670 Service Guide...
Page 18: ...xvi Eserver pSeries 670 Service Guide...
Page 324: ...Yes Go to Step 154A 14 on page 302 304 Eserver pSeries 670 Service Guide...
Page 718: ...698 Eserver pSeries 670 Service Guide...
Page 848: ...L3 Cache Shorts Test Step 4 828 Eserver pSeries 670 Service Guide...
Page 849: ...L3 Cache Shorts Test Step 5 Chapter 9 Removal and Replacement Procedures 829...
Page 851: ...L3 Cache Shorts Test Step 2 Chapter 9 Removal and Replacement Procedures 831...
Page 853: ...L3 Cache Shorts Test Step 4 Chapter 9 Removal and Replacement Procedures 833...
Page 854: ...L3 Cache Shorts Test Step 5 834 Eserver pSeries 670 Service Guide...
Page 971: ...7040 Model 671 Media Subsystem 1 2 3 4 5 6 7 8 9 10 Chapter 10 Parts Information 951...
Page 973: ...Power and SCSI Cables to the Media Subsystem 1 2 3 5 4 6 Chapter 10 Parts Information 953...
Page 986: ...966 Eserver pSeries 670 Service Guide...
Page 990: ...970 Eserver pSeries 670 Service Guide...
Page 1018: ...998 Eserver pSeries 670 Service Guide...
Page 1020: ...1000 Eserver pSeries 670 Service Guide...
Page 1028: ...1008 Eserver pSeries 670 Service Guide...
Page 1031: ......