I/O Subsystem Chassis
Removal
Attention:
This process requires:
v
The use of a lift tool (part number 09P2481) and lift-plate assembly tool (part number 11P4369).
v
The lift tool wheels must be chocked to prevent the chassis from moving during the operation. The
frame must not be on its casters, the leveling pads must be engaged to prevent the frame from moving
during the operation.
1. Read all safety instructions before performing this operation. Unpack lift tool and follow assembly
instructions included with the tool. Inspect the tool for damage (do not perform the remove procedure
with a damaged lift tool). Replace the blue lift plate with the orange lift plate (P/N 11P4369). Orient
two round holes in lift plate to the side of the lift tool that will be closest to the frame.
2. Turn off power as described in “Powering Off and Powering On the System” on page 779.
3. Unplug all power cables from the line power source.
Attention:
Because this procedure is performed with power removed from the system, references
to using the white or green service buttons on the UEPO switch do not apply during the remainder of
this procedure.
4. Open the rack doors and remove them from the rack.
5. Remove the I/O subsystem front cover.
6. If your system is configured with a half I/O drawer filler plate, remove the filler plate.
7. Verify that all cables are labeled. If not, then label all cables and components along with their location
at the front and rear of your system.
8. Remove all DASD hard disk drives or DASD fillers as described in the removal section of “I/O
Subsystem DASD Hard Disk Drive Assembly” on page 929.
9. Remove all DASD 4-pack or 4-pack filler assemblies as described in the removal section of “I/O
Subsystem DASD 4-Pack” on page 931.
10. Remove all DCA units as described in the removal section of “I/O Subsystem Distributed Converter
Assembly (DCA)” on page 925.
11. Remove all I/O subsystem fan assemblies as described in the removal section of “I/O Subsystem
Fan” on page 932.
12. Remove all PCI adapter cassettes as described in the removal section of “PCI Adapters” on
page 851.
13. Remove the I/O backplanes (up to 2) as described in the removal section of “I/O Subsystem I/O
Backplane Assembly” on page 927.
14. Remove the screws that attach the I/O subsystem chassis to the rack.
15. Position the lift tool at the front of the rack. Align the lift tool so that I/O subsystem chassis will not be
blocked (at the lip of the orange lift plate) from removal. Install wheel chocks on the lift tool casters.
Engage the lift tool brake.
16. Raise the plate to a height such that the lift plate is just below the base of the I/O subsystem chassis
you are removing. Release pins on the extender arms and position them on both left and right side.
Arms must fit around the frame extenders and lock in place (do not adjust the lift tool after these
arms are locked in place).
17. One person should gently pull and guide the I/O subsystem chassis onto the lift plate. The I/O
subsystem chassis must be removed far enough to clear the front face of the frame. Retract the
extender arms.
18. Lower I/O subsystem chassis to the bottom position of the lift tool.
19. Remove the wheel chocks and release the brake. Flip the crank handle 180 degrees. Carefully move
the lift tool with the I/O subsystem chassis to the staging area. The brake and wheel chocks must be
in place when transferring the I/O subsystem chassis to or from the packaging material.
Chapter 9. Removal and Replacement Procedures
933
Summary of Contents for pSeries 670
Page 1: ...pSeries 670 Service Guide SA38 0615 03 ERserver...
Page 2: ......
Page 3: ...pSeries 670 Service Guide SA38 0615 03 ERserver...
Page 12: ...x Eserver pSeries 670 Service Guide...
Page 16: ...xiv Eserver pSeries 670 Service Guide...
Page 18: ...xvi Eserver pSeries 670 Service Guide...
Page 324: ...Yes Go to Step 154A 14 on page 302 304 Eserver pSeries 670 Service Guide...
Page 718: ...698 Eserver pSeries 670 Service Guide...
Page 848: ...L3 Cache Shorts Test Step 4 828 Eserver pSeries 670 Service Guide...
Page 849: ...L3 Cache Shorts Test Step 5 Chapter 9 Removal and Replacement Procedures 829...
Page 851: ...L3 Cache Shorts Test Step 2 Chapter 9 Removal and Replacement Procedures 831...
Page 853: ...L3 Cache Shorts Test Step 4 Chapter 9 Removal and Replacement Procedures 833...
Page 854: ...L3 Cache Shorts Test Step 5 834 Eserver pSeries 670 Service Guide...
Page 971: ...7040 Model 671 Media Subsystem 1 2 3 4 5 6 7 8 9 10 Chapter 10 Parts Information 951...
Page 973: ...Power and SCSI Cables to the Media Subsystem 1 2 3 5 4 6 Chapter 10 Parts Information 953...
Page 986: ...966 Eserver pSeries 670 Service Guide...
Page 990: ...970 Eserver pSeries 670 Service Guide...
Page 1018: ...998 Eserver pSeries 670 Service Guide...
Page 1020: ...1000 Eserver pSeries 670 Service Guide...
Page 1028: ...1008 Eserver pSeries 670 Service Guide...
Page 1031: ......