Bulk Power Distributor (BPD)
There can be two BPDs, located immediately above the BPC. If only one BPD is required, an airflow baffle
must installed in the top BPD position.
Attention:
This service procedure may produce other power error code(s) (101x xxxx) between the time
the
Start Service
button is pressed, and the
Service Complete
button is pressed, during concurrent
repair. If normal system operation continues, as described by this procedure, ignore these error codes.
Removal
Attention:
The BPD unit weighs approximately 2.27 kg (5 lbs).
1. Locate the BPD to be replaced.
2. Note the state of the BPD ENBL LED.
3. Press the green
Start Service
button on the UEPO switch.
4. Proceed only if the ENBL (Good) LED goes off or the repair has been scheduled (System outage -
EPO off),
5. Check the ENBL LED for all the BPRs (LED on right side of FRU) on same BPA side. For each BPR
that has this LED in the ON state, manually slide the power switches to the right.
Attention:
Do not switch off units where this LED is already off.
6. Verify that all cables are labeled for plug location and then unplug the cables from the BPD.
7. Loosen the left and right fasteners using the torque tool (part number 6422789). Slide the unit out of
the slot.
Replacement
Attention:
Before proceeding, make sure that all the BPR ENBL LEDs are OFF. For each BPR that has
this LED in the ON state, manually slide the power switches to the right. Do not switch off units where this
LED is already off.
Attention:
Make sure that the UEPO bypass switch on the BPC is in the BYPASS position.
1. Slowly slide the BPD into the slot and carefully seat the BPD against the backplane.
2. Tighten the left and right fasteners with the torque tool.
3. Plug all cables to the BPD, ensuring that the plug location and the cable label agree.
4. Manually move any BPR power switches that are to the right (OFF) position, to the left (ON) position.
5. Move the UEPO bypass switch to the NORMAL position.
6. Press the white
Service Complete
button on the UEPO switch to indicate completion of this
procedure. The BPA automatically configures as it powers on.
Chapter 9. Removal and Replacement Procedures
785
Summary of Contents for pSeries 670
Page 1: ...pSeries 670 Service Guide SA38 0615 03 ERserver...
Page 2: ......
Page 3: ...pSeries 670 Service Guide SA38 0615 03 ERserver...
Page 12: ...x Eserver pSeries 670 Service Guide...
Page 16: ...xiv Eserver pSeries 670 Service Guide...
Page 18: ...xvi Eserver pSeries 670 Service Guide...
Page 324: ...Yes Go to Step 154A 14 on page 302 304 Eserver pSeries 670 Service Guide...
Page 718: ...698 Eserver pSeries 670 Service Guide...
Page 848: ...L3 Cache Shorts Test Step 4 828 Eserver pSeries 670 Service Guide...
Page 849: ...L3 Cache Shorts Test Step 5 Chapter 9 Removal and Replacement Procedures 829...
Page 851: ...L3 Cache Shorts Test Step 2 Chapter 9 Removal and Replacement Procedures 831...
Page 853: ...L3 Cache Shorts Test Step 4 Chapter 9 Removal and Replacement Procedures 833...
Page 854: ...L3 Cache Shorts Test Step 5 834 Eserver pSeries 670 Service Guide...
Page 971: ...7040 Model 671 Media Subsystem 1 2 3 4 5 6 7 8 9 10 Chapter 10 Parts Information 951...
Page 973: ...Power and SCSI Cables to the Media Subsystem 1 2 3 5 4 6 Chapter 10 Parts Information 953...
Page 986: ...966 Eserver pSeries 670 Service Guide...
Page 990: ...970 Eserver pSeries 670 Service Guide...
Page 1018: ...998 Eserver pSeries 670 Service Guide...
Page 1020: ...1000 Eserver pSeries 670 Service Guide...
Page 1028: ...1008 Eserver pSeries 670 Service Guide...
Page 1031: ......