Installation
Acceptance Testing and Startup Procedures
Thermo Fisher Scientific
Model 5030
i
SHARP Instruction Manual
2-3
Remove Packing
(2 pieces)
Figure 2–1.
Remove the Packing Material
4.
Check for possible damage during shipment.
5.
Check that all connectors and circuit boards are firmly attached.
6.
Re-install the cover.
7.
Remove any protective plastic material from the case exterior.
8.
Remove the external pump from its shipping container and place next
to the instrument.
The Model 5030
i
has been bench tested and calibrated at the factory prior
to shipping. The mass sensors, RH sensors, flowmeter temperature sensor,
external ambient temperature sensor, barometric pressure, and volumetric
flow rate have been calibrated to traceable standards. For a quick start,
proceed immediately to the “
Startup
” procedures and skip the “Bench
Acceptance Test”.
To assure the best quality data, it is recommended that you perform an
acceptance test. Furthermore, as part of a quality assurance program
acceptance testing will be conducted prior to field installation. This is an
excellent opportunity to compare the monitor to the primary and transfer
standards utilized by the end-user within their specific monitoring
Acceptance Testing
and Startup
Procedures
Remove Packing
(2 pieces)
Units without Optional I/O Board
Units with Optional I/O Board
Содержание 5030i SHARP
Страница 4: ......
Страница 10: ...About This Manual Where to Get Help vi Model 5030i SHARP Instruction Manual Thermo Fisher Scientific ...
Страница 22: ...Contents xviii Model 5030i SHARP Instruction Manual Thermo Fisher Scientific ...
Страница 26: ...Figures xxii Model 5030i SHARP Instruction Manual Thermo Fisher Scientific ...
Страница 168: ......
Страница 218: ......
Страница 294: ......
Страница 306: ......
Страница 402: ......
Страница 403: ......