'Operation' task card
EVAC panel [NL]
13
300 | 412
Building Technologies
A6V10210424_j_en_--
Fire Safety
2018-08-29
Properties of the 'Evac master' element – 'Overview' tab
The properties of the 'Evac master' element in the 'Details' tab can only be
configured if the EVAC panel [NL] is installed outside the station, it has its own
power supply, and it is connected to the station via an RS485 module (FCA2002).
The properties are grayed out when the EVAC panel [NL] is integrated in the
station.
Figure 135: 'Evac master': Properties in the 'Overview' tab
Property
Value
Description
'Mains supervision
enabled'
On/off
The property determines whether the monitoring of
the mains supply is switched on or not.
'Battery supervision
enabled'
On/off
The property determines whether the monitoring of
the batteries is switched on or not.
'Converter supervision
enabled'
On/off
The property determines whether the monitoring of
power supply is switched on or not.
Information: Only the power supply (70 W)
FP2001-A1 supports this function.
'Enabled'
On/off
The checkbox determines whether the 'Emergency
power delay' property is switched on or not.
'Emergency power delay'
Input field for time period
[hh:mm:ss]
Adjustment range: 1...120
min
Increments: 1 sec
The property determines the length of time the fault
message 'Emergency power operation' is delayed
when the mains supply fails.
NOTICE! EN54-2 allows a maximum delay of
30 min.