1. PREPARATORY PROCEDURES FOR MONITORING
1.3 Option Devices for the Respective Connection
1 - 21
1
P
R
EP
ARA
T
OR
Y
P
R
OCEDURES
FOR
MONIT
O
R
ING
2
C
O
NNECTION T
O
IAI
ROBO
T
CO
N
T
RO
L
L
E
R
3
CONNECTION T
O
AZBI
L C
O
NTR
O
L
EQUI
PMENT
4
CONNECTION T
O
OMRON PLC
5
CONNECTI
O
N T
O
OMRO
N TEMPERA
TURE
CONTROL
LE
R
6
CONNECTION T
O
KE
YENCE PL
C
7
CONNE
C
T
ION T
O
KO
YO
EI
PLC
8
CONN
E
CT
ION T
O
JT
EK
T PL
C
When using a MELSECNET/H communication unit, CC-Link IE Controller Network
communication unit, or CC-Link communication unit (GT15-J61BT13)
Install a MELSECNET/H communication unit, CC-Link IE Controller Network communication unit, or CC-Link
communication unit in the 1st stage of an extension interface.
These communication units cannot be used if installed in the 2nd or higher stage.
Example: When installing a MELSECNET/H communication unit and a serial communication unit
POINT
POINT
POINT
Precautions for using a MELSECNET/H communication unit, CC-Link IE Controller Network communication unit,
CC-Link communication unit (GT15-J61BT13)
The installed stage number of communication units installed on the next stage of MELSECNET/H communication
unit, CC-Link IE Controller Network communication unit, or CC-Link communication unit are recognized by the
GOT differently depending on the extension interface position.
For communication units installed in the extension interface 2 side, even if the communication unit is physically
installed in the 2nd stage position, the GOT recognizes the position as the 1st stage.
Serial communication unit
MELSECNET/H
communication unit
MELSECNET/H
communication unit
Serial communication unit
Recognized as the 3rd stage
of extension interface 1
Recognized as the 2nd stage
of extension interface 2
Recognized as the 1st stage
of extension interface 2
Recognized as the 2nd stage
of extension interface 1
Recognized as the 1st stage
of extension interface 1
MELSECNET/H communication unit
Relay connector
Summary of Contents for GOT 1000 Series
Page 2: ......
Page 76: ...1 46 1 PREPARATORY PROCEDURES FOR MONITORING 1 6 Checking for Normal Monitoring ...
Page 78: ......
Page 114: ...2 36 2 CONNECTION TO IAI ROBOT CONTROLLER 2 7 Precautions ...
Page 232: ...5 18 5 CONNECTION TO OMRON TEMPERATURE CONTROLLER 5 7 Precautions ...
Page 254: ...6 22 6 CONNECTION TO KEYENCE PLC 6 4 Device Range that Can Be Set ...
Page 404: ...14 14 14 CONNECTION TO PANASONIC SERVO AMPLIFIER 14 7 Precautions ...
Page 432: ...REVISIONS 3 ...
Page 435: ......