15. CONNECTION TO PANASONIC INDUSTRIAL DEVICES SUNX PLC
15.3 Connection Diagram
15 - 17
9
CONN
E
C
TION
T
O
S
H
ARP PLC
10
C
O
NN
ECTI
ON
T
O
SHI
N
KO
TECHN
OS IN
DIC
ATI
NG
C
O
NT
ROLLE
R
11
CONNECTION T
O
CH
INO
CONTROLLE
R
12
CONNECTION T
O
T
O
SHI
B
A
PL
C
13
CONNECTION T
O
T
O
SH
IB
A M
A
C
H
IN
E
PLC
14
CONNECTION T
O
P
A
NA
SONIC S
E
R
V
O
A
M
PL
IF
IE
R
15
CONNE
CTION T
O
PA
NA
SONIC
INDUSTRI
AL
DE
VI
CES
SU
NX
PLC
RS422 connection diagram 3)
(For GT1030, GT1020)
*1
Connect FG grounding to the appropriate part of a cable
shield line.
Precautions when preparing a cable
(1) Cable length
The length of the RS-422 cable must be 1200m or less.
(2) GOT side connector
For the GOT side connector, refer to the following.
1.4.1 GOT connector specifications
(3) Connector for Panasonic Industrial Devices SUNX
PLC
Use the connector applicable to the Panasonic
Industrial Devices SUNX PLC.
For details, refer to the Panasonic Industrial Devices
SUNX PLC user's manual.
Connecting terminating resistors
(1) GOT side
(a) For GT16, GT15, GT12
Set the terminating resistor setting switch of the
GOT main unit to "Disable".
(b) For GT14, GT11, GT10
Set the terminating resistor selector to "330 ".
For details of terminating resistor settings, refer to the
following.
1.4.3 Terminating resistors of GOT
R+
R-
S+
S-
SDA
SDB
RDA
RDB
SG
RSA
RSB
CSA
CSB
*1
GOT side
(terminal block)
PLC side
Receive data(+)
Receive data(-)
Send data(+)
Send data(-)
Summary of Contents for GOT 1000 Series
Page 2: ......
Page 76: ...1 46 1 PREPARATORY PROCEDURES FOR MONITORING 1 6 Checking for Normal Monitoring ...
Page 78: ......
Page 114: ...2 36 2 CONNECTION TO IAI ROBOT CONTROLLER 2 7 Precautions ...
Page 232: ...5 18 5 CONNECTION TO OMRON TEMPERATURE CONTROLLER 5 7 Precautions ...
Page 254: ...6 22 6 CONNECTION TO KEYENCE PLC 6 4 Device Range that Can Be Set ...
Page 404: ...14 14 14 CONNECTION TO PANASONIC SERVO AMPLIFIER 14 7 Precautions ...
Page 432: ...REVISIONS 3 ...
Page 435: ......