7 - 20
7. CONNECTION TO KOYO EI PLC
7.3 Connection Diagram
RS422 connection diagram 15)
*1
Connect FG grounding to the appropriate part of a cable shield line.
*2
Connect a terminating resistor (approximately 150 ) to the PLC at a terminal station.
When the number of links exceeds 30, use a transmission line conversion unit D-01CV per 30 links.
For details, refer to the following manual.
KOYO EI PLC user's Manual
RS422 connection diagram 16)
*1
Connect FG grounding to the appropriate part of a cable shield line.
*2
Connect a terminating resistor (approximately 100 to 500 ) to the PLC to be a terminal.
When the number of links exceeds 30, use a transmission line conversion unit D-01CV per 30 links.
For details, refer to the following manual.
KOYO EI PLC user's Manual
GOT side
+TXD
-TXD
+RXD
-RXD
-
+RTS
-RTS
-
LG
+RTS
-RTS
+CTS
-CTS
+TXD
-TXD
-RXD
+RXD
KOYO EI PLC side
+TXD
-TXD
+RXD
-RXD
-
+RTS
-RTS
-
LG
+RTS
-RTS
+CTS
-CTS
+TXD
-TXD
-RXD
+RXD
RDA
RDB
SDA
SDB
RSA
RSB
CSA
CSB
SG
FG
2
7
1
6
3
8
4
9
5
-
14
15
17
16
1 to 6
8
9
18 to 21
7
10
11
12
13
22
23
24
25
14
15
17
16
1 to 6
8
9
18 to 21
7
10
11
12
13
22
23
24
25
KOYO EI PLC side
*1
*1
*2
GOT side
+TXD
-TXD
+RXD
-RXD
5V
-
-
0V
0V
+RTS
-RTS
+CTS
-CTS
KOYO EI PLC side
+TXD
-TXD
+RXD
-RXD
5V
-
-
0V
0V
+RTS
-RTS
+CTS
-CTS
RDA
RDB
SDA
SDB
RSA
RSB
CSA
CSB
SG
FG
2
7
1
6
3
8
4
9
5
-
9
10
13
6
1
2 to 5
8
7
11
12
14
15
9
10
13
6
1
2 to 5
8
7
11
12
14
15
KOYO EI PLC side
*2
*1
*1
Summary of Contents for GOT 1000 Series
Page 2: ......
Page 76: ...1 46 1 PREPARATORY PROCEDURES FOR MONITORING 1 6 Checking for Normal Monitoring ...
Page 78: ......
Page 114: ...2 36 2 CONNECTION TO IAI ROBOT CONTROLLER 2 7 Precautions ...
Page 232: ...5 18 5 CONNECTION TO OMRON TEMPERATURE CONTROLLER 5 7 Precautions ...
Page 254: ...6 22 6 CONNECTION TO KEYENCE PLC 6 4 Device Range that Can Be Set ...
Page 404: ...14 14 14 CONNECTION TO PANASONIC SERVO AMPLIFIER 14 7 Precautions ...
Page 432: ...REVISIONS 3 ...
Page 435: ......