7. CONNECTION TO KOYO EI PLC
7.3 Connection Diagram
7 - 17
1
P
R
EP
ARA
T
OR
Y
P
R
OCEDURES
FOR
MONIT
O
R
ING
2
C
O
NNECTION T
O
IAI
ROBO
T
CO
N
T
RO
L
L
E
R
3
CONNECTION T
O
AZBI
L C
O
NTR
O
L
EQUI
PMENT
4
CONNECTION T
O
OMRON PLC
5
CONNECTI
O
N T
O
OMRO
N TEMPERA
TURE
CONTROL
LE
R
6
CONNECTION T
O
KE
YENCE PL
C
7
CONNE
C
T
ION T
O
KO
YO
EI
PLC
8
CONN
E
CT
ION T
O
JT
EK
T PL
C
RS422 connection diagram 7)
*1
Connect FG grounding to the appropriate part of a cable shield line.
*2
Connect a terminating resistor (approximately 150 ) to the PLC at a terminal station.
When the number of links exceeds 30, use a transmission line conversion unit D-01CV per 30 links.
For details, refer to the following manual.
KOYO EI PLC user's Manual
RS422 connection diagram 8)
*1
Connect FG grounding to the appropriate part of a cable shield line.
*2
Connect a terminating resistor (approximately 100 to 500 ) to the PLC to be a terminal.
When the number of links exceeds 30, use a transmission line conversion unit D-01CV per 30 links.
For details, refer to the following manual.
KOYO EI PLC user's Manual
GOT side
+TXD
-TXD
+RXD
-RXD
-
+RTS
-RTS
-
LG
+RTS
-RTS
+CTS
-CTS
+TXD
-TXD
-RXD
+RXD
KOYO EI PLC side
+TXD
-TXD
+RXD
-RXD
-
+RTS
-RTS
-
LG
+RTS
-RTS
+CTS
-CTS
+TXD
-TXD
-RXD
+RXD
RDA1(RXD1+)
RDB1(RXD1-)
SDA1(TXD1+)
SDB1(TXD1-)
RSA(RTS+)
RSB(RTS-)
CSA(CTS+)
CSB(CTS-)
SG
SDA2(TXD2+)
SDB2(TXD2-)
RDA2(RXD2+)
RDB2(RXD2-)
NC
3
4
1
2
9
10
11
12
13
5
6
7
8
14
Shell
14
15
17
16
1 to 6
8
9
18 to 21
7
10
11
12
13
22
23
24
25
14
15
17
16
1 to 6
8
9
18 to 21
7
10
11
12
13
22
23
24
25
KOYO EI PLC side
*1
*1
*2
GOT side
+TXD
-TXD
+RTS
-RXD
5V
-
0V
+RXD
0V
-RTS
+CTS
-CTS
KOYO EI PLC side
+TXD
-TXD
+RTS
-RXD
5V
-
0V
+RXD
0V
-RTS
+CTS
-CTS
RDA1(RXD1+)
RDB1(RXD1-)
SDA1(TXD1+)
SDB1(TXD1-)
RSA(RTS+)
RSB(RTS-)
CSA(CTS+)
CSB(CTS-)
SG
SDA2(TXD2+)
SDB2(TXD2-)
RDA2(RXD2+)
RDB2(RXD2-)
NC
3
4
1
2
9
10
11
12
13
5
6
7
8
14
Shell
9
10
11
6
1
2 to 5
7
13
8
12
14
15
9
10
11
6
1
2 to 5
7
13
8
12
14
15
KOYO EI PLC side
*1
*1
*2
Summary of Contents for GOT 1000 Series
Page 2: ......
Page 76: ...1 46 1 PREPARATORY PROCEDURES FOR MONITORING 1 6 Checking for Normal Monitoring ...
Page 78: ......
Page 114: ...2 36 2 CONNECTION TO IAI ROBOT CONTROLLER 2 7 Precautions ...
Page 232: ...5 18 5 CONNECTION TO OMRON TEMPERATURE CONTROLLER 5 7 Precautions ...
Page 254: ...6 22 6 CONNECTION TO KEYENCE PLC 6 4 Device Range that Can Be Set ...
Page 404: ...14 14 14 CONNECTION TO PANASONIC SERVO AMPLIFIER 14 7 Precautions ...
Page 432: ...REVISIONS 3 ...
Page 435: ......