1. PREPARATORY PROCEDURES FOR MONITORING
1.5 Verifying GOT Recognizes Connected Equipment
1 - 33
1
P
R
EP
ARA
T
OR
Y
P
R
OCEDURES
FOR
MONIT
O
R
ING
2
C
O
NNECTION T
O
IAI
ROBO
T
CO
N
T
RO
L
L
E
R
3
CONNECTION T
O
AZBI
L C
O
NTR
O
L
EQUI
PMENT
4
CONNECTION T
O
OMRON PLC
5
CONNECTI
O
N T
O
OMRO
N TEMPERA
TURE
CONTROL
LE
R
6
CONNECTION T
O
KE
YENCE PL
C
7
CONNE
C
T
ION T
O
KO
YO
EI
PLC
8
CONN
E
CT
ION T
O
JT
EK
T PL
C
1.5 Verifying GOT Recognizes Connected Equipment
Verify the GOT recognizes controllers on [Communication Settings] of the Utility.
• Channel number of communication interface, communication drivers allocation status
• Communication unit installation status
For details on the Utility, refer to the following manual.
User's Manual of GOT used.
When using GT16, GT12
(For GT16)
1.
After powering up the GOT, touch [Main menu]
[Communication setting] from the Utility.
2.
Touch [Communication setting].
1.
2.
Summary of Contents for GOT 1000 Series
Page 2: ......
Page 76: ...1 46 1 PREPARATORY PROCEDURES FOR MONITORING 1 6 Checking for Normal Monitoring ...
Page 78: ......
Page 114: ...2 36 2 CONNECTION TO IAI ROBOT CONTROLLER 2 7 Precautions ...
Page 232: ...5 18 5 CONNECTION TO OMRON TEMPERATURE CONTROLLER 5 7 Precautions ...
Page 254: ...6 22 6 CONNECTION TO KEYENCE PLC 6 4 Device Range that Can Be Set ...
Page 404: ...14 14 14 CONNECTION TO PANASONIC SERVO AMPLIFIER 14 7 Precautions ...
Page 432: ...REVISIONS 3 ...
Page 435: ......