2. CONNECTION TO IAI ROBOT CONTROLLER
2.3 Connection Diagram
2 - 15
1
P
R
EP
ARA
T
OR
Y
P
R
OCEDURES
FOR
MONIT
O
R
ING
2
C
O
NNECTION T
O
IAI
ROBO
T
CO
N
T
RO
L
L
E
R
3
CONNECTION T
O
AZBI
L C
O
NTR
O
L
EQUI
PMENT
4
CONNECTION T
O
OMRON PLC
5
CONNECTI
O
N T
O
OMRO
N TEMPERA
TURE
CONTROL
LE
R
6
CONNECTION T
O
KE
YENCE PL
C
7
CONNE
C
T
ION T
O
KO
YO
EI
PLC
8
CONN
E
CT
ION T
O
JT
EK
T PL
C
RS232 connection diagram 6)
RS232 connection diagram 7)
RS232 connection diagram 8)
Precautions when preparing a cable
(1) Cable length
The length of RS-232 cables except for the RS-232
cable 3) must be 10m or less.
The length of the RS-232 cable 3) must be 30cm or
less.
(2) GOT side connector
For the GOT side connector, refer to the following.
1.4.1 GOT connector specifications
(3) IAI Robot Controller side connector
Use the connector compatible with the IAI Robot
Controller.
For details, refer to the IAI Robot Controller user's
manual.
2.3.2
RS-422/485 cable
Connection diagram
RS422/485 connection diagram 1)
RS422/485 connection diagram 2)
RS422/485 connection diagram 3) (For GT16)
GOT side
SD
RD
ER
DR
SG
RS
CS
NC
NC
RS232C conversion unit
side (RCB-CV-MW)
1
2
3
4
5
6
7
8
9
1
2
3
4
5
6
7
8
9
CD
RD (RXD)
SD (TXD)
ER (DTR)
SG
DR (DSR)
RS (RTS)
CS (CTS)
-
-
RD
SD
SG
ER
DR
RS
CS
-
SIO converter side
1
2
3
5
4
6
7
8
9
SD
RD
ER
DR
SG
RS
CS
NC
NC
-
RD
SD
SG
ER
DR
RS
CS
-
SIO converter side
GOT side
1
2
3
5
4
6
7
8
9
1
2
3
4
Junction box 4D side
E-CON Connector (Plug)
Model name : -1473562-4
Terminating resistor
220Ω 1/4W
1
2
3
4
Junction box 4D side
E-CON Connector (Plug)
Model name : -1473562-4
Junction box 4D side
E-CON Connector (Plug)
Model name : -1473562-4
1
2
3
4
6
8
2
10
12
5
7
14
16
18
20
1
3
4
9
11
13
15
17
19
GOT side
SDA1 (TXD1+)
SDB1 (TXD1-)
SG
RDA1 (RXD1+)
RDB1 (RXD1-)
SDA2 (TXD2+)
SDB2 (TXD2-)
RSA (RTS+)
RSB (RTS-)
CSA (CTS+)
CSB (CTS-)
NC
NC
NC
RDA2 (RXD2+)
RDB2 (RXD2-)
NC
NC
NC
NC
Junction box 4D side
E-CON Connector (Plug)
Model name : -1473562-4
1
2
3
4
Terminating resistor
220
Ω
1/2W
Summary of Contents for GOT 1000 Series
Page 2: ......
Page 76: ...1 46 1 PREPARATORY PROCEDURES FOR MONITORING 1 6 Checking for Normal Monitoring ...
Page 78: ......
Page 114: ...2 36 2 CONNECTION TO IAI ROBOT CONTROLLER 2 7 Precautions ...
Page 232: ...5 18 5 CONNECTION TO OMRON TEMPERATURE CONTROLLER 5 7 Precautions ...
Page 254: ...6 22 6 CONNECTION TO KEYENCE PLC 6 4 Device Range that Can Be Set ...
Page 404: ...14 14 14 CONNECTION TO PANASONIC SERVO AMPLIFIER 14 7 Precautions ...
Page 432: ...REVISIONS 3 ...
Page 435: ......