10 - 6
10. CONNECTION TO SHINKO TECHNOS INDICATING CONTROLLER
10.3 Connection Diagram
10.3 Connection Diagram
The following diagram shows the connection between the
GOT and the PLC.
10.3.1 RS-232 cable
Connection diagram
RS232 connection diagram 1)
*1
Connect FG grounding to the appropriate part of a cable
shield line.
Precautions when preparing a cable
(1) Cable length
The length of the RS-232 cable must be 15m or less.
(2) GOT side connector
For the GOT side connector, refer to the following.
1.4.1 GOT connector specifications
(3) Shinko Technos indicating controller side connector
Use the connector compatible with the Shinko Technos
indicating controller side.
For details, refer to the user's manual of the Shinko
Technos indicating controller.
GOT side
1
2
3
4
5
6
7
8
9
-
Indicating
controller side
CD
RD(RXD)
SD(TXD)
ER(DTR)
SG
DR(DSR)
RS(RTS)
CS(CTS)
NC
FG
COM
TX
RX
*1
Summary of Contents for GOT 1000 Series
Page 2: ......
Page 76: ...1 46 1 PREPARATORY PROCEDURES FOR MONITORING 1 6 Checking for Normal Monitoring ...
Page 78: ......
Page 114: ...2 36 2 CONNECTION TO IAI ROBOT CONTROLLER 2 7 Precautions ...
Page 232: ...5 18 5 CONNECTION TO OMRON TEMPERATURE CONTROLLER 5 7 Precautions ...
Page 254: ...6 22 6 CONNECTION TO KEYENCE PLC 6 4 Device Range that Can Be Set ...
Page 404: ...14 14 14 CONNECTION TO PANASONIC SERVO AMPLIFIER 14 7 Precautions ...
Page 432: ...REVISIONS 3 ...
Page 435: ......