11. CONNECTION TO CHINO CONTROLLER
11.3 Connection Diagram
11 - 23
9
CONN
E
C
TION
T
O
S
H
ARP PLC
10
C
O
NN
ECTI
ON
T
O
SHI
N
KO
TECHN
OS IN
DIC
ATI
NG
C
O
NT
ROLLE
R
11
CONNECTION T
O
CH
INO
CONTROLLE
R
12
CONNECTION T
O
T
O
SHI
B
A
PL
C
13
CONNECTION T
O
T
O
SH
IB
A M
A
C
H
IN
E
PLC
14
CONNECTION T
O
P
A
NA
SONIC S
E
R
V
O
A
M
PL
IF
IE
R
15
CONNE
CTION T
O
PA
NA
SONIC
INDUSTRI
AL
DE
VI
CES
SU
NX
PLC
RS485 connection diagram 12)
*1
Pin No. of controller differs depending on the model. Refer to the following table.
*2
Terminating resistor should be provided for a controller which will be terminating resistors.
*3
Set the Communication Type switch of the converter to RS-485.
RS485 connection diagram 13)
(For GT16, GT15)
*1
Pin No. of controller differs depending on the model. Refer to the following table.
*2
Terminating resistor should be provided for a controller which will be terminating resistors.
*3
Set the terminating resistor of The GOT side.
■
Connecting terminating resistors
*4
Do not connect SG of the controller and SG of the GOT.
Signal name
Controller type
SE3000
JU
KE3000
LE5000
Terminal
name
Terminal
No.
Terminal
name
Terminal
name
RDA
RDA
3
RDA
RDA
RDB
RDB
4
RDB
RDB
SDA
SDA
1
SDA
SDA
SDB
SDB
2
SDB
SDB
SG
SG
5
SG
SG
Signal name
Controller type
SE3000
JU
KE3000
LE5000
Terminal
name
Terminal
No.
Terminal
name
Terminal
name
RDA
RDA
3
RDA
RDA
RDB
RDB
4
RDB
RDB
SDA
SDA
1
SDA
SDA
SDB
SDB
2
SDB
SDB
SG
SG
5
SG
SG
Interface converter
SC8-10
*3
Controller
*1
Term
RDA
RDB
SDA
SDB
4
5
6
7
8
RDA
RDB
SDA
SDB
SG
RDA
RDB
SDA
SDB
SG
Controller
*1
Terminating resistor (100Ω 1/4W)
*2
GOT side
*3
Controller
*1
SDA1
SDB1
RDA1
RDB1
SDA2
SDB2
RDA2
RDB2
SG
FG
1
2
3
4
5
6
7
8
9
10
RDA
RDB
SDA
SDB
SG
*4
RDA
RDB
SDA
SDB
SG
Controller
*1
Terminating resistor (100Ω 1/4W)
*2
Summary of Contents for GOT 1000 Series
Page 2: ......
Page 76: ...1 46 1 PREPARATORY PROCEDURES FOR MONITORING 1 6 Checking for Normal Monitoring ...
Page 78: ......
Page 114: ...2 36 2 CONNECTION TO IAI ROBOT CONTROLLER 2 7 Precautions ...
Page 232: ...5 18 5 CONNECTION TO OMRON TEMPERATURE CONTROLLER 5 7 Precautions ...
Page 254: ...6 22 6 CONNECTION TO KEYENCE PLC 6 4 Device Range that Can Be Set ...
Page 404: ...14 14 14 CONNECTION TO PANASONIC SERVO AMPLIFIER 14 7 Precautions ...
Page 432: ...REVISIONS 3 ...
Page 435: ......