11. CONNECTION TO CHINO CONTROLLER
11.3 Connection Diagram
11 - 15
9
CONN
E
C
TION
T
O
S
H
ARP PLC
10
C
O
NN
ECTI
ON
T
O
SHI
N
KO
TECHN
OS IN
DIC
ATI
NG
C
O
NT
ROLLE
R
11
CONNECTION T
O
CH
INO
CONTROLLE
R
12
CONNECTION T
O
T
O
SHI
B
A
PL
C
13
CONNECTION T
O
T
O
SH
IB
A M
A
C
H
IN
E
PLC
14
CONNECTION T
O
P
A
NA
SONIC S
E
R
V
O
A
M
PL
IF
IE
R
15
CONNE
CTION T
O
PA
NA
SONIC
INDUSTRI
AL
DE
VI
CES
SU
NX
PLC
Precautions when preparing a cable
(1) Cable length
The length of the RS-422 cable must be 1200m or less.
(2) GOT side connector
For the GOT side connector, refer to the following.
1.4.1 GOT connector specifications
(3) CHINO controller side connector
Use the connector compatible with the CHINO
controller side module.
For details, refer to the user's manual of the CHINO
controller.
Connecting terminating resistors
(1) GOT side
When connecting a CHINO controller to the GOT, a
terminating resistor must be connected to the GOT.
(a) For GT16, GT15, GT12
Set the terminating resistor setting switch of the
GOT main unit to "100 OHM".
(b) For GT14, GT11
Set the terminating resistor selector to "330 ".
For the procedure to set the terminating resistor, refer
to the following.
1.4.3 Terminating resistors of GOT
(2) CHINO controller side
When connecting a CHINO controller to the GOT, a
terminating resistor must be connected to the CHINO
controller.
User's Manual of the CHINO controller
Summary of Contents for GOT 1000 Series
Page 2: ......
Page 76: ...1 46 1 PREPARATORY PROCEDURES FOR MONITORING 1 6 Checking for Normal Monitoring ...
Page 78: ......
Page 114: ...2 36 2 CONNECTION TO IAI ROBOT CONTROLLER 2 7 Precautions ...
Page 232: ...5 18 5 CONNECTION TO OMRON TEMPERATURE CONTROLLER 5 7 Precautions ...
Page 254: ...6 22 6 CONNECTION TO KEYENCE PLC 6 4 Device Range that Can Be Set ...
Page 404: ...14 14 14 CONNECTION TO PANASONIC SERVO AMPLIFIER 14 7 Precautions ...
Page 432: ...REVISIONS 3 ...
Page 435: ......