GE Multilin
T60 Transformer Protection System
C-3
APPENDIX C
C.2 SERVER DATA ORGANIZATION
C
C.2SERVER DATA ORGANIZATION
C.2.1 OVERVIEW
IEC 61850 defines an object-oriented approach to data and services. An IEC 61850
physical device
can contain one or
more
logical device(s)
. Each logical device can contain many
logical nodes
. Each logical node can contain many
data
objects
. Each data object is composed of
data attributes
and
data attribute components
. Services are available at each
level for performing various functions, such as reading, writing, control commands, and reporting.
Each T60 IED represents one IEC 61850 physical device. The physical device contains one logical device, and the logical
device contains many logical nodes. The logical node LPHD1 contains information about the T60 IED physical device. The
logical node LLN0 contains information about the T60 IED logical device.
C.2.2 GGIO1: DIGITAL STATUS VALUES
The GGIO1 logical node is available in the T60 to provide access to as many 128 digital status points and associated time-
stamps and quality flags. The data content must be configured before the data can be used. GGIO1 provides digital status
points for access by clients.
It is intended that clients use GGIO1 in order to access digital status values from the T60. Configuration settings are pro-
vided to allow the selection of the number of digital status indications available in GGIO1 (8 to 128), and to allow the choice
of the T60 FlexLogic operands that drive the status of the GGIO1 status indications. Clients can utilize the IEC 61850 buff-
ered and unbuffered reporting features available from GGIO1 in order to build sequence of events (SOE) logs and HMI dis-
play screens. Buffered reporting should generally be used for SOE logs since the buffering capability reduces the chances
of missing data state changes. Unbuffered reporting should generally be used for local status display.
C.2.3 GGIO2: DIGITAL CONTROL VALUES
The GGIO2 logical node is available to provide access to the T60 virtual inputs. Virtual inputs are single-point control
(binary) values that can be written by clients. They are generally used as control inputs. GGIO2 provides access to the vir-
tual inputs through the IEC 61850 standard control model (ctlModel) services:
•
Status only.
•
Direct control with normal security.
•
SBO control with normal security.
Configuration settings are available to select the control model for each point. Each virtual input used through GGIO2
should have its
VIRTUAL INPUT 1(64) FUNCTION
setting programmed as “Enabled” and its corresponding
GGIO2 CF SPSCO1(64)
CTLMODEL
setting programmed to the appropriate control configuration.
C.2.4 GGIO3: DIGITAL STATUS AND ANALOG VALUES FROM GOOSE DATA
The GGIO3 logical node is available to provide access for clients to values received via configurable GOOSE messages.
The values of the digital status indications and analog values in GGIO3 originate in GOOSE messages sent from other
devices.
C.2.5 GGIO4: GENERIC ANALOG MEASURED VALUES
The GGIO4 logical node provides access to as many as 32 analog value points, as well as associated timestamps and
quality flags. The data content must be configured before the data can be used. GGIO4 provides analog values for access
by clients.
It is intended that clients use GGIO4 to access generic analog values from the T60. Configuration settings allow the selec-
tion of the number of analog values available in GGIO4 (4 to 32) and the choice of the FlexAnalog values that determine
the value of the GGIO4 analog inputs. Clients can utilize polling or the IEC 61850 unbuffered reporting feature available
from GGIO4 in order to obtain the analog values provided by GGIO4.
Summary of Contents for T60
Page 6: ...vi T60 Transformer Protection System GE Multilin TABLE OF CONTENTS ...
Page 14: ...xiv T60 Transformer Protection System GE Multilin TABLE OF CONTENTS ...
Page 34: ...1 20 T60 Transformer Protection System GE Multilin 1 5 USING THE RELAY 1 GETTING STARTED 1 ...
Page 490: ...5 344 T60 Transformer Protection System GE Multilin 5 10 TESTING 5 SETTINGS 5 ...
Page 522: ...6 32 T60 Transformer Protection System GE Multilin 6 5 PRODUCT INFORMATION 6 ACTUAL VALUES 6 ...
Page 536: ...7 14 T60 Transformer Protection System GE Multilin 7 1 COMMANDS 7 COMMANDS AND TARGETS 7 ...
Page 568: ...10 12 T60 Transformer Protection System GE Multilin 10 6 DISPOSAL 10 MAINTENANCE 10 ...
Page 596: ...A 28 T60 Transformer Protection System GE Multilin A 1 PARAMETER LISTS APPENDIX A A ...
Page 716: ...B 120 T60 Transformer Protection System GE Multilin B 4 MEMORY MAPPING APPENDIX B B ...
Page 762: ...E 10 T60 Transformer Protection System GE Multilin E 1 IEC 60870 5 104 PROTOCOL APPENDIX E E ...
Page 774: ...F 12 T60 Transformer Protection System GE Multilin F 2 DNP POINT LISTS APPENDIX F F ...