5-160
T60 Transformer Protection System
GE Multilin
5.5 FLEXLOGIC
5 SETTINGS
5
ELEMENT
Breaker restrike
BRK RESTRIKE 1 OP
BRK RESTRIKE 1 OP A
BRK RESTRIKE 1 OP B
BRK RESTRIKE 1 OP C
Breaker restrike detected in any phase of the breaker control 1 element
Breaker restrike detected in phase A of the breaker control 1 element
Breaker restrike detected in phase B of the breaker control 1 element
Breaker restrike detected in phase C of the breaker control 1 element
BKR RESTRIKE 2 to 3
Same set of operands as shown for BKR RESTRIKE 1
ELEMENT:
Breaker control
BREAKER 1 OFF CMD
BREAKER 1 ON CMD
BREAKER 1
Φ
A BAD ST
BREAKER 1
Φ
A INTERM
BREAKER 1
Φ
A CLSD
BREAKER 1
Φ
A OPEN
BREAKER 1
Φ
B BAD ST
BREAKER 1
Φ
B INTERM
BREAKER 1
Φ
B CLSD
BREAKER 1
Φ
B OPEN
BREAKER 1
Φ
C BAD ST
BREAKER 1
Φ
C INTERM
BREAKER 1
Φ
C CLSD
BREAKER 1
Φ
C OPEN
BREAKER 1 BAD STATUS
BREAKER 1 CLOSED
BREAKER 1 OPEN
BREAKER 1 DISCREP
BREAKER 1 TROUBLE
BREAKER 1 MNL CLS
BREAKER 1 TRIP A
BREAKER 1 TRIP B
BREAKER 1 TRIP C
BREAKER 1 ANY P OPEN
BREAKER 1 ONE P OPEN
BREAKER 1 OOS
Breaker 1 open command initiated
Breaker 1 close command initiated
Breaker 1 phase A bad status is detected (discrepancy between
the 52/a and 52/b contacts)
Breaker 1 phase A intermediate status is detected (transition from one
position to another)
Breaker 1 phase A is closed
Breaker 1 phase A is open
Breaker 1 phase B bad status is detected (discrepancy between
the 52/a and 52/b contacts)
Breaker 1 phase B intermediate status is detected (transition from one
position to another)
Breaker 1 phase B is closed
Breaker 1 phase B is open
Breaker 1 phase C bad status is detected (discrepancy between
the 52/a and 52/b contacts)
Breaker 1 phase C intermediate status is detected (transition from one
position to another)
Breaker 1 phase C is closed
Breaker 1 phase C is open
Breaker 1 bad status is detected on any pole
Breaker 1 is closed
Breaker 1 is open
Breaker 1 has discrepancy
Breaker 1 trouble alarm
Breaker 1 manual close
Breaker 1 trip phase A command
Breaker 1 trip phase B command
Breaker 1 trip phase C command
At least one pole of breaker 1 is open
Only one pole of breaker 1 is open
Breaker 1 is out of service
BREAKER 2 to 6
Same set of operands as shown for BREAKER 1
ELEMENT:
CT fail
CT FAIL 1 PKP
CT FAIL 1 OP
CT fail has picked up
CT fail has dropped out
CT FAIL 2 to 6
Same set of operands as per CT FAIL 1
ELEMENT:
Digital counters
Counter 1 HI
Counter 1 EQL
Counter 1 LO
Digital counter 1 output is ‘more than’ comparison value
Digital counter 1 output is ‘equal to’ comparison value
Digital counter 1 output is ‘less than’ comparison value
Counter 2 to 8
Same set of operands as shown for Counter 1
ELEMENT:
Digital elements
Dig Element 1 PKP
Dig Element 1 OP
Dig Element 1 DPO
Digital Element 1 is picked up
Digital Element 1 is operated
Digital Element 1 is dropped out
Dig Element 2 to 48
Same set of operands as shown for Dig Element 1
ELEMENT
Frequency rate of
change
FREQ RATE 1 PKP
FREQ RATE 1 DPO
FREQ RATE 1 OP
The frequency rate of change 1 element has picked up
The frequency rate of change 1 element has dropped out
The frequency rate of change 1 element has operated
FREQ RATE 2 to 4
Same set of operands as shown for FREQ RATE 1
ELEMENT:
FlexElements
FxE 1 PKP
FxE 1 OP
FxE 1 DPO
FlexElement 1 has picked up
FlexElement 1 has operated
FlexElement 1 has dropped out
FxE 2 to 16
Same set of operands as shown for FxE 1
Table 5–20: T60 FLEXLOGIC OPERANDS (Sheet 2 of 9)
OPERAND TYPE
OPERAND SYNTAX
OPERAND DESCRIPTION
Summary of Contents for T60
Page 6: ...vi T60 Transformer Protection System GE Multilin TABLE OF CONTENTS ...
Page 14: ...xiv T60 Transformer Protection System GE Multilin TABLE OF CONTENTS ...
Page 34: ...1 20 T60 Transformer Protection System GE Multilin 1 5 USING THE RELAY 1 GETTING STARTED 1 ...
Page 490: ...5 344 T60 Transformer Protection System GE Multilin 5 10 TESTING 5 SETTINGS 5 ...
Page 522: ...6 32 T60 Transformer Protection System GE Multilin 6 5 PRODUCT INFORMATION 6 ACTUAL VALUES 6 ...
Page 536: ...7 14 T60 Transformer Protection System GE Multilin 7 1 COMMANDS 7 COMMANDS AND TARGETS 7 ...
Page 568: ...10 12 T60 Transformer Protection System GE Multilin 10 6 DISPOSAL 10 MAINTENANCE 10 ...
Page 596: ...A 28 T60 Transformer Protection System GE Multilin A 1 PARAMETER LISTS APPENDIX A A ...
Page 716: ...B 120 T60 Transformer Protection System GE Multilin B 4 MEMORY MAPPING APPENDIX B B ...
Page 762: ...E 10 T60 Transformer Protection System GE Multilin E 1 IEC 60870 5 104 PROTOCOL APPENDIX E E ...
Page 774: ...F 12 T60 Transformer Protection System GE Multilin F 2 DNP POINT LISTS APPENDIX F F ...