
Chapter 9 Performance Test
9-8
9.2 Performance Test for Error Detector
This section describes the performance test items for the error detector.
Maximum input level and patterns
Before testing the performance of the ED, confirm that the performance of
the tested pulse pattern generator satisfies the specifications.
9.2.1 Required equipment
The following table shows the equipment required for the performance
test.
Before starting performance tests, warm up the BERTWave and the
measuring instruments for at least 1 hour.
Table 9.2.1-1 Equipment for Performance Test
Product Name
Required Performance
Recommended
Equipment
Sampling
oscilloscope
Electrical interface
Bandwidth: 20 GHz or more
MP2100B
(Anritsu)
Fixed
attenuator
20 dB
SMA connector
41KC-20
(Anritsu)
Summary of Contents for BERTWave MP2100B
Page 24: ...xxiv...
Page 96: ...Chapter 2 Before Use 2 42...
Page 112: ...Chapter 3 Connecting with DUT 3 16...
Page 250: ...Chapter 7 Measuring Waveform 7 64 Figure 7 12 1 Marker Display...
Page 262: ...Chapter 7 Measuring Waveform 7 76...
Page 276: ...Chapter 8 Operating Optical Interface 8 14...
Page 304: ...Chapter 9 Performance Test 9 28...
Page 320: ...Chapter 10 Maintenance 10 16...
Page 374: ...Appendix E Performance Test Record Form E 10...
Page 382: ...Index Index 6...