
Chapter 9 Performance Test
9-6
19. Connect the PPG1 Data Out connector to the input connector
of the sampling oscilloscope.
20. Repeat steps 11 to 14.
PPG2 can be tested in the same way with the Option 012. The connection
diagram is as follows.
Sampling Oscilloscope
Sync Out
Trigger
Input
PPG2 Data Out
Input
Coaxial Terminator
Figure 9.1.3-3 PPG2 Data Out Waveform Test Connection Diagram
Sampling Oscilloscope
Sync Out
Trigger
Input
PPG2 Data Out
Input
Coaxial Terminator
Figure 9.1.3-4 PPG2
Data
Out Waveform Test Connection Diagram
ED3 and ED4 can be tested in the same way with the Option 014. The
connection diagram for measuring the ED3 input level is as follows.
Summary of Contents for BERTWave MP2100B
Page 24: ...xxiv...
Page 96: ...Chapter 2 Before Use 2 42...
Page 112: ...Chapter 3 Connecting with DUT 3 16...
Page 250: ...Chapter 7 Measuring Waveform 7 64 Figure 7 12 1 Marker Display...
Page 262: ...Chapter 7 Measuring Waveform 7 76...
Page 276: ...Chapter 8 Operating Optical Interface 8 14...
Page 304: ...Chapter 9 Performance Test 9 28...
Page 320: ...Chapter 10 Maintenance 10 16...
Page 374: ...Appendix E Performance Test Record Form E 10...
Page 382: ...Index Index 6...