
III
Index
10
1
2
3
4
5
6
7
8
9
A
ppendix
Table of Contents
For Safety ............................................................ iii
About This Manual ................................................. I
Chapter 1 Outline ............................................... 1-1
Introduction of BERTWave .......................................... 1-2
Configuration .............................................................. 1-3
Features ..................................................................... 1-8
Intended Use .............................................................. 1-9
Technical Terms ....................................................... 1-13
Abbreviations ............................................................ 1-23
Chapter 2 Before Use ......................................... 2-1
Unpacking and Installation .......................................... 2-2
Part Names ................................................................. 2-5
Power Connection ..................................................... 2-10
Connecting Peripheral Devices ................................. 2-12
Connecting Remote Control Devices ......................... 2-13
Cautions on Handling Optical Fiber Cables ............... 2-14
Connecting Coaxial Cable ......................................... 2-16
Installing Optical Transceiver .................................... 2-17
Turning Power On/Off ............................................... 2-20
Using Touch Panel and Rotary Knob ......................... 2-23
Setting Control Panel ................................................ 2-24
Using External Monitor .............................................. 2-26
Configuring Power Options ....................................... 2-28
Setting Interface for Remote Control ......................... 2-29
Precautions for Preventing Damage .......................... 2-34
System Recovery Function ....................................... 2-40
Chapter 3 Connecting with DUT ....................... 3-1
Measuring Bit Error Rate ............................................. 3-2
Measuring Waveform .................................................. 3-7
Measuring QSFP Module Bit Error Rate .................... 3-14
Summary of Contents for BERTWave MP2100B
Page 24: ...xxiv...
Page 96: ...Chapter 2 Before Use 2 42...
Page 112: ...Chapter 3 Connecting with DUT 3 16...
Page 250: ...Chapter 7 Measuring Waveform 7 64 Figure 7 12 1 Marker Display...
Page 262: ...Chapter 7 Measuring Waveform 7 76...
Page 276: ...Chapter 8 Operating Optical Interface 8 14...
Page 304: ...Chapter 9 Performance Test 9 28...
Page 320: ...Chapter 10 Maintenance 10 16...
Page 374: ...Appendix E Performance Test Record Form E 10...
Page 382: ...Index Index 6...