
Chapter 5 Generating Pulse Signal
5-14
When monitoring the waveforms of two DUTs simultaneously, make the
following connections.
Figure 5.4-4 Setup for Simultaneous Monitoring of Two Channels
Set the Ch2 Reference Clock to Ch1 even when the measurement system
includes long-distance transmission.
Figure 5.4-5 Measurement System Including Long-distance
Transmission
Procedures:
1. Touch the screen size change button, and set to [Expand].
2. Touch the Reference CLK button.
The selection screen is displayed. The number of the displayed
buttons vary with the option configuration.
3.
Touch the reference clock button, referring to Table 5.4-1.
DUT
Sync
Out
Trigger Input
Option 012 or 014
DUT
Ch A
Input
Set Ch2 Reference
Clk to Ch1
Ch B
Input
Sampling
Oscilloscope
Sync
Out
Option 012 or
014
Sampling
Oscilloscope
Ch A
Input
Set Ch2 Reference
Clk to Ch1
Ch B
Input
Optical Transceiver
(Transmitter)
Optical Transceiver
(Receiver)
Long Fiber
Summary of Contents for BERTWave MP2100B
Page 24: ...xxiv...
Page 96: ...Chapter 2 Before Use 2 42...
Page 112: ...Chapter 3 Connecting with DUT 3 16...
Page 250: ...Chapter 7 Measuring Waveform 7 64 Figure 7 12 1 Marker Display...
Page 262: ...Chapter 7 Measuring Waveform 7 76...
Page 276: ...Chapter 8 Operating Optical Interface 8 14...
Page 304: ...Chapter 9 Performance Test 9 28...
Page 320: ...Chapter 10 Maintenance 10 16...
Page 374: ...Appendix E Performance Test Record Form E 10...
Page 382: ...Index Index 6...